London-based Piercy & Co architects have specified a fibre cement EQUITONE facade on the 1 Baker's Row development in Clerkenwell Green Conservation Area.
Anthracite-coloured EQUITONE [natura] was specified because the architects felt that the matt surface appearance created a contemporary aesthetic that interfaced well with the adjoining historic buildings.
EQUITONE [natura] allows the textures of the fibre cement to show through, creating a tactile, smooth surface. It is a sustainable and low maintenance exterior rainscreen cladding material that combines excellent aesthetics with durability and impact resistance.
The architects achieved an engaging streetscape using EQUITONE material to create a jewel-like facade. The result is a striking contrast between a bold exterior of contextually sensitive fibre cement material and adjoining traditional buff and red brickwork buildings.
Sensitive design and careful choice of materials was important because 1 Baker's Row, part of Great Marlborough Estates, is a small and constrained site that is located in an architecturally interesting part of central London.
"We conceived 1 Baker's Row as a polished and refined gemstone to reflect the neighbourhood's diamond trade heritage," said Matti Lampila, Associate at Piercy & Co. "We were initially attracted to EQUITONE because we liked the appearance of the material. Once we understood its performance benefits it was a relatively easy decision to specify it for the whole facade."
Matti added: "The fibre cement facade was able to create an engaging interface between the old and new architectural styles within this densely built up area of London. The dark, matt, fibre cement skin of the building makes an interesting play of light and colour that adds to its appeal."
The EQUITONE panels were rivet fixed to the steel frame structure by Hatfield-based GDG Cladding using Marley Eternit's Helping Hand framing system. Framing brackets, incorporating thermal pads, were fixed to horizontal metal top-hat sections. The walls achieve a U-value of 0.2W/m²K. 1 Bakers Row is built to Code for Sustainable Homes Level 4.
An EQUITONE architectural fibre cement facade material can achieve an A+ rating as defined in the BRE's Green Guide to Specification based on generic rating for autoclaved fibre cement single sheet - (Element Ref: 80623042, 806230422, 806230447, 806230450).
Construction News
10/04/2014
Architects Create Gem In Central London


13/05/2025
Construction has commenced on a major new £38 million leisure and wellbeing hub in Caerphilly.
The state-of-the-art facility is set to become a cornerstone of the Caerphilly Town 2035 placemaking plan, transforming a previously unused area of scrubland into a vibrant, inclusive community space.
Co

13/05/2025
Costain has been awarded a significant contract by Urenco to deliver the front-end engineering design (FEED) for a pioneering nuclear fuel production facility in Cheshire.
The project will mark Europe's first High Assay Low Enriched Uranium (HALEU) Advanced Fuels Facility, aimed at supporting the

13/05/2025
Construction has officially begun on a new 38,000 sq ft commercial vehicle workshop and sales facility for Motus Commercials at Ravenscraig, marking a major step forward in the regeneration of one of Europe's largest brownfield sites.
A ground-breaking ceremony recently held signalled the start of

13/05/2025
Plans to transform the underused Dorrington Gardens car park into new housing have taken a major step forward, following approval by Havering Council's Strategic Planning Committee.
The approved scheme will see the creation of 34 new homes, comprising a mix of houses and apartments. The development

13/05/2025
Construction work on the Alexandra Theatre redevelopment in Bognor Regis is progressing on schedule, as the project continues to reshape one of the town’s most iconic cultural landmarks.
The latest project update confirms that key construction milestones have been achieved, including the commenceme

13/05/2025
Cambridge City Council has released updated plans for its Civic Quarter project, which aims to transform three of the city centre's key landmarks, the Cambridge Market, Corn Exchange, and Guildhall, into more inclusive, accessible, and sustainable spaces. The public is now invited to give feedback o

13/05/2025
Kier Natural Resources, part of the Integrated Operational Solutions (IOS) Alliance, has renewed its partnership with Anglian Water through a new five-year contract as part of the company’s AMP8 investment programme.
The agreement will support Anglian Water's £11 billion investment initiative, mar

13/05/2025
A major new housing development has been announced in Stechford, Birmingham, as part of efforts to address the West Midlands' deepening housing crisis.
Nearly 300 affordable homes, including 150 designated for social rent, will be constructed on the site of the former Yardley Sewage Works in Cole H

13/05/2025
In the realm of workplace accidents and chemical spills, every second counts. The rapid response to emergency situations can often be the line between minor inconvenience and severe injury.
With regulations such as those set by both international and European standards, the importance of safety eq

13/05/2025
Four schools in Peterborough are set to undergo expansion works later this year to meet increasing demand for school places, following funding approvals from Peterborough City Council.
The schools – Duke of Bedford Primary School in Thorney, Stanground Academy, Marshfields School, and NeneGate Scho