Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

23/08/2013

Balfour Beatty To Build Emergency Dept

Balfour Beatty has been awarded a £14.4 million contract by the North West London Hospitals NHS Trust to construct a new Emergency Department at Northwick Park Hospital in Harrow.

The pavilion style building will provide users with a new walk-in entrance, waiting area, and external drop off area; all with direct and level access to the car park.

Enclosed link bridges will connect the new building to other parts of the hospital including acute admissions, paediatrics, the Intensive Treatment Unit and operating theatres. A lower level will provide accommodation such as offices, seminar rooms and the main plant room.

Balfour Beatty Engineering Services will deliver the M&E services installation package including modular services units, which are constructed off site, and help to provide high quality, pre-tested services. The modular construction method also helps to reduce installation times and improves safety over in-situ installation methods.

-- Advertisement --
hss

The scheme will be constructed utilising Balfour Beatty’s latest Building Information Modelling techniques which enable stakeholders to view the building from a user perspective and in multidimensional detail before the build, and also help to minimise construction time and costs.

The scheme will be a centre of excellence for urgent and emergency care, supporting the Trust’s vision to improve treatment times and the experience of emergency department users. It will also support effective staff training and is designed to equip the department to respond effectively to existing and future changes in demand.

The building has been designed to be highly sustainable and features such as a roof top bio-diversity garden containing sedum plants and wildflowers will help the building fit into the natural ecology of the area as well as providing pleasant views for the occupants of other buildings. Other sustainability features include an array of power providing photo-voltaic cells, an efficient combined heat and power unit, as well as LED lighting.

Works are scheduled for completion in April 2014.

(CD)

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Lakeside HirePro Structures LtdBRICOFLOR UKDGC Speed SprayA24 Security SystemsSeymour Dugan InteriorsSolar Up LtdSVR Plastics Limited.Best BrickworkPE3 Pipeline Services Ltd