The first phase of HS2, the planned high speed railway between London, the West Midlands, Manchester and Leeds moved another step forward with the launch of consultations on the project's draft Environmental statement (ES) and proposed design refinements.
The draft ES sets out HS2 Ltd's current thinking on plans to integrate the line into the landscape using the very latest design and construction methods, both during building and operation.
The design refinements consultation is an opportunity to comment on the most significant proposed changes to the design of phase one of the scheme between London and Birmingham. The refinements, some of which have been made following representations from individuals and organisations, help make the railway the very best it can be.
Transport Secretary Patrick McLoughlin said: "HS2 is absolutely vital for this country, providing a huge economic boost which will generate a return on investment that will continue paying back for generations to come. But you cannot build a new railway line without causing some disruption.
"What we can and will do is ensure that disruption is kept to a minimum by using the very latest design and construction methods.
"We are confident that through continued hard work we can ensure that many of the feared effects of HS2 never materialise. We also know that the best design for the scheme can only be reached with the input of local communities, environmental groups and all levels of government.
"Publication of these plans is a crucial next step and will ensure that construction of the first phase can begin within the next four years."
The draft ES and proposed design refinements are open to full public consultation with responses required by 11 July. Consultation on the draft ES is not a statutory requirement but the government recognises the importance of ensuring widespread engagement on the scheme. Its publication is an important stage in the project as it helps prepare the formal 'Environmental statement' that is essential for the Hybrid Bill – effectively the planning application for the project – due to be published later in 2013.
HS2 Ltd is seeking to build on the best practice of constructing and running a high-speed network, established both on HS1 and abroad. It is looking to use technology unique to Europe in helping to cut the noise of high-speed trains, such as eliminating the gaps between train carriages to cut noise as they travel and boost their aerodynamic efficiency.
(CD/MH)
Construction News
16/05/2013
First Phase OF HS2 Moves Forward


04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments.
With a reputation for accuracy and reliability, Atlas

03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham.
This marks the first phase of development at the 227-acre site.
The scheme will deliver a range of purpose-built units from 4,820 sq ft

03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough.
Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive

03/07/2025
Plans to boost North Lincolnshire's transport infrastructure have reached a significant milestone with the completion of Phase 1 of the M181 'southern junction' project.
Led by North Lincolnshire Council in partnership with National Highways, the multi-million-pound scheme includes the construction

03/07/2025
The multi-million-pound refurbishment of Watford Colosseum has reached practical completion, with the historic venue now officially handed over to operator AEG Presents UK.
Led by Watford Borough Council and delivered by Morgan Sindall Construction's Northern Home Counties division, the major upgra

03/07/2025
Sigma Capital Group has announced the acquisition of four new development sites worth around £100 million in gross development cost (GDC), continuing its strategic partnership with Vistry Group.
The projects will deliver 415 new single-family rental homes across England, further cementing Sigma's

03/07/2025
A major £215,000 upgrade to the Winsover Road level crossing in Spalding is set to begin this Saturday night, 5 July, aimed at improving rail reliability and ensuring safety for motorists, pedestrians and rail users.
The essential works will see a full replacement of the life-expired crossing surfa

03/07/2025
A former office building in Cardiff Bay has been given a new lease of life, with 33 high-quality council apartments now handed over to Cardiff Council as part of a wider redevelopment to deliver 78 new homes.
The Scott Harbour building, once a commercial office block, is undergoing a major conversi

03/07/2025
Social value specialist Loop has launched the UK's first monetised social value metrics tool tailored specifically for the housing sector, offering developers a new, data-driven approach to strengthen planning applications, engage communities and showcase real-world benefits.
Developed in partnersh

02/07/2025
Construction is officially underway on the new Whitefield Community Fire Station, part of Greater Manchester Fire and Rescue Service's (GMFRS) £38 million Estates Improvement Programme.
Led by Robertson Construction North West, the project will replace the former fire station on Bury New Road with