Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

16/05/2013

First Phase OF HS2 Moves Forward

The first phase of HS2, the planned high speed railway between London, the West Midlands, Manchester and Leeds moved another step forward with the launch of consultations on the project's draft Environmental statement (ES) and proposed design refinements.

The draft ES sets out HS2 Ltd's current thinking on plans to integrate the line into the landscape using the very latest design and construction methods, both during building and operation.

The design refinements consultation is an opportunity to comment on the most significant proposed changes to the design of phase one of the scheme between London and Birmingham. The refinements, some of which have been made following representations from individuals and organisations, help make the railway the very best it can be.

Transport Secretary Patrick McLoughlin said: "HS2 is absolutely vital for this country, providing a huge economic boost which will generate a return on investment that will continue paying back for generations to come. But you cannot build a new railway line without causing some disruption.

-- Advertisement --
hss

"What we can and will do is ensure that disruption is kept to a minimum by using the very latest design and construction methods.

"We are confident that through continued hard work we can ensure that many of the feared effects of HS2 never materialise. We also know that the best design for the scheme can only be reached with the input of local communities, environmental groups and all levels of government.

"Publication of these plans is a crucial next step and will ensure that construction of the first phase can begin within the next four years."

The draft ES and proposed design refinements are open to full public consultation with responses required by 11 July. Consultation on the draft ES is not a statutory requirement but the government recognises the importance of ensuring widespread engagement on the scheme. Its publication is an important stage in the project as it helps prepare the formal 'Environmental statement' that is essential for the Hybrid Bill – effectively the planning application for the project – due to be published later in 2013.

HS2 Ltd is seeking to build on the best practice of constructing and running a high-speed network, established both on HS1 and abroad. It is looking to use technology unique to Europe in helping to cut the noise of high-speed trains, such as eliminating the gaps between train carriages to cut noise as they travel and boost their aerodynamic efficiency.

(CD/MH)

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Lakeside HirePro Structures LtdBRICOFLOR UKMartin UK Roofing Systems LtdPolarwall LtdButler SignsRKP Access PlatformsB W M GroundworksNoiseAssess Acoustic ConsultancyS.J.Stanberry & Sons LTD