Design ACB has submitted a planning application for the Alpine House development, a 1.4 Ha. mixed-use site in Brent, North London.
The sustainability credentials of the scheme, formed of four blocks comprising 144 residential units, 1,800m2 of B1 office accommodation and five live/work units, have been recognised as exemplar for London and the UK by the Greater London Authority (GLA). The project has been in design development for 9 months and will commence on site in Spring 2013, subject to planning.
Design ACB, with their client Jaysam Developments [Stanmore] Limited, has been working on the redevelopment of a former light industrial estate in North London to create high quality family housing. The scheme comprises four mixed-use 5-storey buildings, basement car parking and associated landscaping, as well as major improvements to the public realm to help regenerate the immediate area.
The design provides a variety of unit types through the use of interlocking apartments, duplexes and family homes. The scheme delivers a well-balanced mix of housing tenure, offering opportunities for social, intermediate and open market accommodation. All apartments exceed London Housing Design Guide spatial standards and feature private amenity space in the form of balconies and terraces. The scheme is spacious both inside and out with a controlled 'home zone' area that minimises all but essential vehicular access, creating a much improved pedestrian environment benefitting the families who will live there. There are ample shared amenity spaces across the scheme for residents and visitors to enjoy, including a dedicated childrens' 'play space'.
The double-height commercial live/work units positioned to the front of the scheme have been designed in collaboration with the artists’ charity ACAVA (the Association for Cultural Advancement through Visual Art), thereby ensuring their needs as future residents are met.
Of the four buildings, three are clad in buff brick with brass infill while the final block, containing most of the B1 accommodation at ground floor, reverses the materiality of the others and is clad in brass with brick infill. The architectural and material quality ensures the buildings are contextual and contemporary, reflecting the industrial urban history of the local area. The buildings also feature a perforated metal and brick lattice with an ornamental pattern that creates interest across the scheme while providing a filtering screen to diffuse light and air flow, and provides privacy for residents.
The housing exceeds Code for Sustainable Homes Level 4 with 80% carbon dioxide reduction in Dwelling Emission Rate over 2010 building regulations, and 50% of the scheme's carbon emissions being offset with onsite renewables. The commercial spaces will achieve a BREEAM 'Excellent' rating.
David Ayre, Project Director, said: "We're delighted to be working with Jaysam Developments [Stanmore] Limited on the Alpine House project. As well as being the biggest project the studio has won so far, it will also be our most sustainable housing project. It's a fantastic opportunity, not only for us, but for this area of Brent."
Design ACB is currently developing proposals for a number of housing schemes in London and across southern England.
Construction News
27/11/2012
Design ACB Submits Planning For £25m Exemplar Sustainable Mixed-Use Development


03/07/2025
The multi-million-pound refurbishment of Watford Colosseum has reached practical completion, with the historic venue now officially handed over to operator AEG Presents UK.
Led by Watford Borough Council and delivered by Morgan Sindall Construction's Northern Home Counties division, the major upgra

03/07/2025
Plans to boost North Lincolnshire's transport infrastructure have reached a significant milestone with the completion of Phase 1 of the M181 'southern junction' project.
Led by North Lincolnshire Council in partnership with National Highways, the multi-million-pound scheme includes the construction

03/07/2025
Sigma Capital Group has announced the acquisition of four new development sites worth around £100 million in gross development cost (GDC), continuing its strategic partnership with Vistry Group.
The projects will deliver 415 new single-family rental homes across England, further cementing Sigma's

03/07/2025
A major £215,000 upgrade to the Winsover Road level crossing in Spalding is set to begin this Saturday night, 5 July, aimed at improving rail reliability and ensuring safety for motorists, pedestrians and rail users.
The essential works will see a full replacement of the life-expired crossing surfa

03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough.
Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive

02/07/2025
Construction is officially underway on the new Whitefield Community Fire Station, part of Greater Manchester Fire and Rescue Service's (GMFRS) £38 million Estates Improvement Programme.
Led by Robertson Construction North West, the project will replace the former fire station on Bury New Road with

02/07/2025
Hull City Council has officially appointed Esh Construction to lead a major repair and strengthening programme on Drypool Bridge, one of the city's key transport links.
The project will be delivered in partnership with engineering consultancy Mason Clark Associates.
Work will begin on the south s

02/07/2025
Award-winning housebuilder The Hill Group has announced record financial results for the year ending 31 March 2025, marking its second consecutive year of historic growth.
The company reported a turnover of £1.15 billion and a pre-tax profit of £90.5 million, completing more than 2,800 new homes a

02/07/2025
Women in Construction Anglia (WICA) and Suffolk Chamber of Commerce have voiced strong support for the government's new plans to increase the construction workforce by 100,000 people annually.
The announcement follows the launch of the first Construction Skills Mission Board, attended by Work and P

02/07/2025
Huddersfield Station will undergo a significant upgrade this autumn as part of the multi-billion-pound Transpennine Route Upgrade (TRU), with a full 30-day closure scheduled from Saturday 30 August to Sunday 28 September 2025.
The closure represents a major milestone in the delivery of a faster, gr