Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

08/08/2012

ISG Secures £16m City Tower Scheme

ISG has secured the £16 million project to refurbish and upgrade City Tower in Basinghall Street, London for owners Great Portland Estates and investment firm Starwood Capital.

The contract sees ISG working across 10 floors of the 21-storey office building – approximately 80,000 sq ft of accommodation, which will remain partially occupied throughout the duration of the fast-track project.

The scheme, a continuation of ISG's existing relationship with Great Portland Estates, encompasses major refurbishment and remodelling works both internally and externally at City Tower, to deliver BREEAM very good office accommodation and improved public realm space. A key element of the project focuses on the enhancement of the two-storey podium deck at the base of the structure, occupying a much larger footprint than the tower and including a public high walkway area.

-- Advertisement --
hss

At podium level, ISG will build a new glazed entrance portico, create a contemporary reception area and form a secondary entrance. Major structural alterations will see the introduction of new roof lights on the podium deck and performance glazing to the southern elevation to maximise the volume of natural light entering the building’s lower levels. The existing restaurant and hard landscaping elements on the high walkway area will be carefully removed and a new attractive landscaping scheme introduced to enhance the public area surrounding City Tower.

The tower's façade will also be upgraded as part of the programme, with ISG installing replacement aluminium cladding panels to enhance the visual impact of the building. Significant structural work will also be carried out across the tower’s roof with the introduction of enlarged plant openings and removal and replacement of existing water tanks.

ISG will fit out the open plan office accommodation to Cat A standard and undertake a major programme of mechanical and electrical works to improve the efficiency of building services. This work will be carried out on a seasonal basis to minimise disruption to tenants in occupation across the remaining floors within the building. The project is scheduled for completion in summer 2013.

(CD/GK)

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
BRICOFLOR UKPro Structures LtdLakeside HireJAG Wall CoatingsWorksafe Electrical Services LtdYorkshire Loft Ladders LTDSteeltech  Sheds NISteeltech Sheds NIIndustrial Flooring Contractors LTDSVR Plastics Limited.