Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,458 companies....

Construction News

12/03/2012

New £13m Flood Defence Scheme Opens

Construction News Image
Environment Minister, John Griffiths has opened a flood defence scheme at Borth, Ceredigion which will protect 420 homes and businesses as well as the Cambrian Coast railway.

The new scheme includes a rock reef to not only improve protection but also enhance its growing reputation as a tourist destination for surfers.

Because of its location directly on the seafront, Borth has a history of coastal flooding. The proximity of the community to the sea means that a severe storm could have devastating consequences on the village and its rich history.

Construction works have included replacement of the old timber defences, the construction of the defence/surfing reef, two rock breakwaters, two rock groynes and importing thousands of tonnes of shingle to build up the natural shingle banks.
-- Advertisement --
hss



The scheme has been jointly funded by the Welsh Government (£7.5m) and the European Regional Development Fund (£5.49m) and Ceredigion County Council (£0.16m)

Speaking at the opening the Minister said: "This coastal defence scheme has given us the opportunity to enhance the environment and amenities of this area. By adapting the design of the reef to improve surfing conditions the scheme has also ensured a real boost to the tourism industry and local economy. This will be of particular interest to the many keen surfers that come to Borth each year.

"As well as the reduced risk of flooding and support to local tourism sites, this scheme will also benefit the community of Borth. This has been achieved by raising community awareness of the risk of flooding and highlighting the simple actions that can be taken to make homes more resilient. These actions include signing up to the free Flood Warnings Direct service offered by the Environment Agency. We cannot stop all flooding, and coastal communities need to remain vigilant as the risk of flooding is forecast to increase.

"The Welsh Government priorities are to reduce the consequences of flooding, raise awareness of flooding, to respond effectively to flooding and to prioritise our investments.

"Borth is an excellent example of an area where our investment has been prioritised to reduce risk to a vulnerable community."

Investing in flood and coastal erosion risk management across Wales is a Programme for Government key action for creating sustainable places for people in Wales.

(CD/GK)

Latest Construction News

04/07/2025
JV North has announced the list of contractors and consultants appointed to its £500 million social housebuilding framework, which aims to deliver around 3,000 homes across the North West over the next four years. The housing consortium, which includes 14 members, launched the procurement process i
04/07/2025
Work has officially started on preparing Eston Precinct for demolition, marking the first step in a major regeneration project led by Redcar & Cleveland Borough Council. Esh Construction has been appointed to deliver the scheme, which will begin with the safe removal of asbestos and the soft strip
04/07/2025
The Secretary of State for Energy Security and Net Zero hasgranted development consent for the Mona Offshore Wind Farm. The scheme, located in the Irish Sea, will deliver approximately 1,500MW of clean energy capacity and forms part of the Round 4 Offshore Wind Licensing Arrangements. The applicati
04/07/2025
The restoration of Chatham’s iconic Brook Theatre is officially underway, with the appointment of contractors to carry out the £21 million transformation of the 125-year-old building. Originally opened in 1899 as Chatham Town Hall, the Grade II listed Renaissance-style landmark has served the commu
04/07/2025
Work to upgrade a flood-prone section of Stockbridge Road in Timsbury is set to begin later this month, as part of a joint project between the Environment Agency and Hampshire County Council to improve local flood defences. Starting on 28 July, the five-week scheme will deliver vital improvements a
04/07/2025
Oldham's town centre regeneration has taken a major step forward, with planning consent now granted for all six sites earmarked for transformation through the partnership between Muse and Oldham Council. The approval represents a significant milestone in the long-term vision to create a vibrant, in
04/07/2025
As temperatures soared during this week's heatwave, euroloo's innovative EcoWelfare units proved to be a game-changer on construction and outdoor sites across the country. Designed with comfort and sustainability in mind, these multi-functional welfare units offer everything teams need to stay pro
04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments. With a reputation for accuracy and reliability, Atlas
03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham. This marks the first phase of development at the 227-acre site. The scheme will deliver a range of purpose-built units from 4,820 sq ft
03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough. Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive
Stuart CanvasLakeside HireAqua Direct LtdEfco UK LtdWestermans International LtdManchester Skip CompanySalford SkipsBest BrickworkApproved Site Investigations LtdSmiths Concrete Ltd