Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

30/07/2010

New Leisure Centre Approved For Lewisham

A new two-pool leisure and fitness centre, to replace Forest Hill Pools on Dartmouth Road, has been approved by Lewisham Council Planning Committee.

The facility is Lewisham's fourth new leisure centre development to be approved in recent years. A new leisure complex was opened in Downham in 2007, and an additional 25-metre pool was opened at Wavelengths Leisure Centre in Deptford in 2008. A third leisure centre is currently being built in Lewisham Town Centre to replace the leisure facility at Ladywell.

A building contractor for the development is expected to be appointed before the end of the year and the Council aims to have the new leisure centre in public use by late 2012.

The new planning application for Forest Hill allows for the alteration, part demolition and refurbishment of the existing Forest Hill Pools building to provide a new pool and leisure centre behind the existing Victorian frontage which will be retained.

-- Advertisement --
hss

The existing frontage will be refurbished to form the main entrance and reception to the building as well as providing a changing area on the first floor. The majority of the facilities will be provided in the proposed modern additions.

Facilities in the new building will include a 25-metre pool, a 16.7-metre learner pool, fitness gym, two studios, a community room and a café. The new development will include facilities and access for those people with disabilities. There will be disabled parking, bicycle and motorcycle parking and a drop-off area for vehicles.

Councillor Chris Best, Cabinet Member for Community Services, said: "Lewisham is finally getting the first-class replacement leisure centre it deserves at Forest Hill.

"It has been a real challenge trying to find a design that can accommodate the many different needs of the local community. An absolute priority has been to make sure the new facility is fully accessible to everyone who chooses to use it but we have also had to work within tight budget constraints as well as the restrictions placed on us by the size and shape of the site.

"However, after a long and comprehensive period of consultation, combined with some serious thinking about the design and the cost, I think we have now achieved an excellent result. I want to say a huge thank you to the Forest Hill Pools Stakeholder Group and everyone else who has spent so much time and energy on this. We can now look forward to a first-class facility that can be enjoyed by everyone for years to come."

(CD)

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
BRICOFLOR UKPro Structures LtdLakeside HireHeritage Cob & LimeYardBoxHush Garden RoomsCounty Flat Roofing (UK) LtdFernhill StoneEECO EnergyChristopher Hodges Planning & Design