Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,407 companies....

Construction News

12/12/2025

Doity Engineering Introduce Modular Cabin Staircases

Doity Engineering design practical solutions that make site life easier. Their latest launch does exactly that. The Modular Cabin Staircase System is a purpose-built access solution for modern modular buildings, site cabins and multi-storey units, designed to install fast, adapt easily and perform safely in real site conditions.



Why We Built a Better Cabin Staircase

You told us you wanted a staircase system with the same engineering reliability as our mezzanine platforms, just purpose-designed for cabins and modular units.

Standard stair solutions often slow projects down. They’re rigid, labour-heavy and difficult to adapt when layouts change. Our modular staircase removes those problems. It’s prefabricated, flexible and built for the realities of construction sites.



Key Features & Benefits

Engineered for Real Site Conditions

Our stair modules are designed to suit rise heights from around 2,540mm to 3,250mm, making them ideal for stacked cabins and multi-level units. With different module lengths available, most layouts can be accommodated without compromise.

Fast, Plug-and-Play Installation

Each staircase arrives pre-drilled and prefabricated, ready for rapid on-site assembly. That means less installation time, fewer people required, and minimal disruption on busy sites.

-- Advertisement --
hss

Flexible Landings & Walkways

Site layouts change, and our stairs are built to keep up. Optional landing modules and walkways allow configurations to run left or right, connect units, or link stacked cabins exactly as needed.

Linked Stair Modules for Stacked Cabins

Working with double-stacked cabins? Our linking modules provide safe, compliant inter-cabin access, with configurable landings to suit your site setup.

Compact Steps for Smaller Units

Not every unit needs a full staircase. For toilet blocks or single-level welfare units, we supply compact access steps, robust, weather-resistant and quick to install.

Safety First, Always

Designed primarily for temporary site use, our staircases can also be engineered for permanent applications where Building Regulations apply. Steel construction ensures durability, stability and long-term compliance.



How We Deliver

• Manufacture: All modules are fabricated in-house to our strict quality standards

• Delivery: Fully prefabricated components arrive site-ready

• Adaptability: Stair runs can be extended or reconfigured as layouts change

• Installation: Our experienced teams install quickly, safely and with minimal disruption



Why Choose Doity Engineering

With over 60 years of precision engineering experience, we’re best known for our Revlok mezzanine floor system, a fast, strong, modular solution built around cold-rolled steel and clever design.

We’ve applied that same thinking to our cabin staircases. The result? A modular, robust access system tailored exactly to your site requirements, without unnecessary complexity.

Whether your project is temporary or long-term, our staircases provide safe, flexible access you can rely on.



Ideal Applications

• Modular office units

• Construction site cabins

• Stacked welfare accommodation

• Site toilet and welfare blocks

• Multi-level modular buildings



Ready to Get Started?

If you’re working with cabins or modular buildings and need a reliable access solution, our Modular Cabin Staircase System could be a perfect fit.

Get in touch with Doity Engineering today, we’ll help keep your site safe, efficient and moving forward.

doity.com/cabin-staircases/

Latest Construction News

22/07/2026
Kier has been appointed to the new YORhub YORbuild Major Works 2 framework, worth £1.5bn, enhancing its capacity to deliver major public sector projects across Yorkshire and the Humber, the North East and neighbouring areas. The framework provides access to substantial building schemes for eligible
Read More
22/07/2026
Permasteelisa Group has been appointed to deliver the façade refurbishment of 60 Queen Victoria Street in the City of London. Working alongside Mace Construct, the team will remove the original envelope from the nine-storey building, refurbish and reinstall it, and design, manufacture and install n
Read More
22/07/2026
Galliford Try has been selected for the new Crescent Purchasing Consortium (CPC) Construction and Capital Works framework. The company’s appointment spans all five regional lots across England, Wales and Scotland. The framework, which will run for a maximum of eight years, will be used to procure a
Read More
22/07/2026
Southern Water is set to launch an extensive programme on the Isle of Wight aimed at reducing storm overflows at priority sites, with around £20 million earmarked for solutions. The investment will target Newport, Gurnard, West and East Cowes, Ryde and locations across West Wight, supporting effort
Read More
22/07/2026
Civic has been shortlisted in four categories at the AJ Retrofit & Reuse Awards 2026, which recognise excellence in the adaptation of buildings and the reuse of materials and structures in response to the climate crisis. The nominations cover residential and office adaptive reuse and decarbonisation
Read More
22/07/2026
Breedon Group plc is set to increase production of Welsh Slate roofing slates at its Penrhyn Quarry in North Wales with the installation of a state-of-the-art saw line costing £750,000. The new line is intended to meet sustained demand for the slates, which are widely specified internationally for
Read More
22/07/2026
Croydon Council has approved the first phase of a £30m restoration of the historic Selsdon Park Hotel, paving the way for the long-vacant site to be brought back into use. Located on Addington Road in Selsdon, the estate's history stretches back over a millennium, with records of a manor at Selsdon
Read More
22/07/2026
Balfour Beatty has been selected by Leeds City Council as the sole contractor to deliver the Leeds Inner Ring Road Strategy, a long-term package of maintenance, asset renewal and major structural upgrades to protect one of the city's most important transport corridors. The work, valued at up to £12
Read More
22/07/2026
The UK construction industry needs around 206,000 additional workers between 2026 and 2030. The obvious response is to recruit. The problem is that every contractor is looking for the same experienced tradespeople, supervisors and managers. More job adverts do not create more skilled workers. They
Read More
21/07/2026
Network Rail will renew rails and sleepers more than 50 years old between Battlesbridge and Southminster during a seven-day closure in August, helping to keep services safe, reliable and comfortable for passengers. While the Crouch Valley line is closed, engineers will also carry out a range of mai
Read More
BRICOFLOR UKPro Structures LtdLakeside HireHomecare Plumbing Supplies LtdMetal & Glass SolutionsMetal & Glass SolutionsProtek ProductsBanner World LtdYou Say We SprayRosehill Carpentry & Joinery Services