Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,394 companies....

Construction News

08/09/2023

Hexham Flood Alleviation Scheme Complete

The Environment Agency (EA) has announced the successful completion of the £6.5 million Hexham Flood Alleviation Scheme, which will better protects up to 90 businesses at two key industrial estates at risk from The Rivers Tyne and Skinnersburn.

Both rivers have a long history of flooding, notably causing considerable damage and disruption at the Bridge End and Tyne Mills Industrial Estates on 5 December 2015 during Storm Desmond.

The scheme was formally opened on 7 September by Guy Opperman MP at an official ribbon cutting event attended by the key members of the community and partners who helped to bring the scheme to completion.

Hexham is a popular tourist destination in Northumberland with striking architecture, picturesque parks and an extensive historical past.

The new defences, a combination of flood walls and grass embankments, will help to protect one of the town's most important commercial areas, providing increased job security by protecting the places people work, keeping businesses open and supporting the wider local economy.

On the south bank, at Tyne Mills, 300 metres of new flood defence has been constructed from east of the Northumbrian Water Peth Head Pumping Station and along the edge of the Northumberland County Council yard, crossing the Skinnersburn and tying into high ground.

-- Advertisement --
hss

On the north bank, at Bridge End, 370 metres of new flood defence has been created from the existing flood embankment behind Egger UK Ltd to the former Reiver Sports site, where it crosses the site and ties into high ground in the northwest corner.

As well as reducing flood risk, the scheme has also been cutting carbon by trialling the use of two innovative mixes of low-carbon concretes for the first time in the UK. The climate-friendly low carbon mix has been used across two panels of the defences, totalling 27 metres.

Leila Huntington, Environment Agency Operations Manager, said: "We are delighted that the £6.5 million flood scheme at Hexham is now complete, reducing the flood risk to 90 properties, ahead of winter this year.

"For those affected by flooding, the impact can be catastrophic and life changing. We hope these defences will bring peace of mind to everybody living and working in the area and will for many years to come."

Guy Opperman MP for Tynedale and Ponteland said: "Storm Desmond had a devastating impacting on businesses in Hexham. This scheme will restore confidence by giving improved protection to those properties while supporting economic prosperity and protecting jobs in the town.

"With a Government contribution of £5.7m, this is part of a record £5.2 billion investment in flood defences across the country from 2021 to 2027, to help communities be better prepared for the impacts of climate change."

BAM and Arup were delivery partners on the scheme, working on the design and construction of the defences, whilst Northumberland County Council helped to provide additional funding.

Gareth Farrier, Divisional Director at BAM, said: "It has been fantastic to support the Environment Agency in the delivery of these vital flood defences in Hexham. The success of the scheme is the result of the incredible collaboration between the Environment Agency, Arup, BAM and our suppliers which has delivered not only long-term flood protection for the town, but also a pioneering low-carbon concrete design."

Donald Daly, Associate at Arup said: "The scheme's use of low carbon concrete demonstrates the innovation now possible for climate resilience interventions. Arup has been privileged to support the Environment Agency in reducing the risk of flooding to Hexham while also reducing the embodied carbon of grey infrastructure, enabling net zero and resilience agendas to work hand in hand."

Latest Construction News

17/07/2026
Jacobs has secured three new commissions with National Highways, strengthening its role in supporting the modernization, resilience and long-term performance of the UK’s strategic road network. The appointments will see Jacobs deliver key asset renewal and project leadership services designed to im
Read More
17/07/2026
Vistry and Platform Housing Group have joined forces to deliver a 177-home, 100% affordable housing development on the former Simon Digby School site in Chelmsley Wood, Solihull. The 4.5-hectare site, which has been identified for residential development for more than a decade, will see Platform Ho
Read More
17/07/2026
A new housing development in Devizes is set to deliver more than £3.5 million in funding for local services and infrastructure, as the first homes are completed at the site. Bellway's Lock Keeper Gardens development, located on land between Coate Road and the Kennet and Avon Canal on the eastern ed
Read More
17/07/2026
Morgan Sindall Construction has been reappointed to both value bands of the new £1.5bn YORbuild Major Works 2 framework, which will deliver major public-sector building projects across Yorkshire and the Humber and adjacent areas. The renewed places extend the company's long-standing partnership wit
Read More
17/07/2026
As the UK construction industry continues to demonstrate resilience amid ongoing economic uncertainty, experts within the invoice finance sector are reporting increased demand from construction businesses seeking flexible working capital solutions to support growth, manage rising costs, and overcome
Read More
17/07/2026
Preparatory works have commenced in West Vale on a transport improvement programme designed to better link Elland town centre with neighbouring areas. Approved by planners in November 2024, the package aims to deliver safer, more convenient routes and to enhance access to the planned new Elland Rai
Read More
17/07/2026
Sefton Council's cabinet will next week be asked to approve the next stage of its Sefton 2030 housing programme, enabling partner The Sovini Group to start feasibility work on three potential development sites: the former Ainsdale Hope School, the Professional Development Centre in Formby, and the f
Read More
17/07/2026
The Mayor of Olney, Councillor Debbie Whitworth, has officially opened a new community facility at Yardley Manor, a mixed-tenure residential development being delivered by Vistry and Taylor Wimpey in Buckinghamshire. The new building has been created as a central meeting place for residents and loc
Read More
17/07/2026
Yorkshire Water has begun work to upgrade equipment at the Ecclesall Road and Granville Road combined storm overflows (CSOs) in Sheffield. The works involve installing new mechanical screens, kiosks and control panels, alongside upgrades to mechanical and engineering instrumentation, to improve the
Read More
17/07/2026
Knowsley Council's Cabinet has agreed to move forward with the next stage of investment in Kirkby town centre, approving plans for a leisure-led scheme at the heart of the town. The Council has already committed more than £43.8 million to Kirkby since purchasing the town centre from the private sec
Read More
BRICOFLOR UKLakeside HirePro Structures LtdB W M GroundworksNoiseAssess Acoustic ConsultancyS.J.Stanberry & Sons LTDAlpine Landscapes, Paving and Building ServicesGLW Engineering & Construction LtdThe Chiltern Lift Company LtdDIY Building Supplies