Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,458 companies....

Construction News

28/07/2023

Pagabo Launch New £1.6bn Decarbonisation Solutions Framework

Construction News Image
Procurement firm, Pagabo, has issued Prior Information Notices (PIN) for two brand-new frameworks dedicated to decarbonisation projects, worth £1.6 billion.

Being delivered as solutions-based frameworks, the offering will complement Pagabo's existing suite of frameworks, appointing the specialist decarbonisation organisations to provide expert services to current and new clients.

Both frameworks will be valued at £1.6bn and run for four years and each will have its own contracting authority. One framework will be dedicated for healthcare schemes, with Great Ormond Street Hospital (GOSH) serving as a sector-specialist host. Meanwhile, the second framework will be hosted by Hull City Council and be open to all other sectors.

Both frameworks will be open to a full range of main contractors, suppliers and consultants. It will be separated into two main lots:

• Lot 1 – Retrofit Consultancy

• Lot 2 – Main Contractor Delivery

Under Lot 1, clients will be able to appoint retrofit assessors, coordinators, designers and evaluators to provide specialist consultancy services for decarbonisation projects. To be appointed to this lot, consultants will be required to hold relevant accreditations, such as PAS2035 or PAS2038.

These PAS accreditations are concerned with the assessment of domestic dwellings and commercial buildings for energy retrofit. This involves identifying areas of improvement and specifying and designing the relevant improvement measures – and is also concerned with the monitoring of retrofit projects.
-- Advertisement --
hss



Clients will be able to engage these Lot 1 suppliers to define what is needed to achieve net carbon in an asset. The suppliers will be able to provide a full business case for the delivery, then sit client-side throughout the delivery phase in a coordination role.

Under Lot 2, main contractors will be appointed to provide a complete business solution for clients. This allows clients to go directly to main contractors to undertake the retrofit assessments, work up costs, and bring in supply chain partners to deliver the scheme, while serving as a single point of contact.

Lot 2 will have four value bands covering the below:

• Lot 2a - £250k to £1m

• Lot 2b - £1m to £5m

• Lot 2c - £5m to £15m

• Lot 2d - £15m and above

It will also be split by three scopes to ensure that main contractors are active in the relevant market, with a requirement to submit evidence case studies. These scopes will cover:

• Domestic Low Rise

• Domestic High Rise

• Non-Domestic – commercial, health, education, and leisure

Recognising the range of different organisations with the ability to deliver projects in differing scales around the country, the frameworks will be split to cover 12 geographical regions and will ensure SME and local-based supplier involvement.

A Dynamic Purchasing System (DPS) is scheduled to be created after the commencement of frameworks and will provide additional flexibility for clients.

Jason Stapley, Chief Procurement Officer at Pagabo, said: "The environmental impact of construction has been widely discussed for years, and that conversation continues. There is a wide understanding of the need to design for net zero, but there is still a long way to go to meet government targets and improving our current building stock will play a key role in this.

"There are a lot of specialist organisations out there that are able to assist clients with their net zero projects and strategies, and having these dedicated frameworks means that their services will be easier to access in a compliant manner for public sector organisations. In turn, this gets these all-important decarbonisation schemes underway as quickly as possible for the benefit of the planet – and adds great human benefits for people and communities around delivered schemes.

"We're pleased to be bringing forward this resource for the market and working with the wider market to make sure it's absolutely meeting client and supplier demands. It's also the first framework collaboration with both contracting authorities – Hull City Council and Great Ormond Street Hospital - so we're very much looking forward to ongoing collaboration with its team."

Over the coming months, we will be carrying out further market engagement activity to allow for a collaborative development process following the release of both prior information notices. It is expected that the invitation to tender (ITT) will open in early September, ahead of the frameworks going live late January 2024.

Latest Construction News

04/07/2025
JV North has announced the list of contractors and consultants appointed to its £500 million social housebuilding framework, which aims to deliver around 3,000 homes across the North West over the next four years. The housing consortium, which includes 14 members, launched the procurement process i
04/07/2025
Work has officially started on preparing Eston Precinct for demolition, marking the first step in a major regeneration project led by Redcar & Cleveland Borough Council. Esh Construction has been appointed to deliver the scheme, which will begin with the safe removal of asbestos and the soft strip
04/07/2025
The Secretary of State for Energy Security and Net Zero hasgranted development consent for the Mona Offshore Wind Farm. The scheme, located in the Irish Sea, will deliver approximately 1,500MW of clean energy capacity and forms part of the Round 4 Offshore Wind Licensing Arrangements. The applicati
04/07/2025
The restoration of Chatham’s iconic Brook Theatre is officially underway, with the appointment of contractors to carry out the £21 million transformation of the 125-year-old building. Originally opened in 1899 as Chatham Town Hall, the Grade II listed Renaissance-style landmark has served the commu
04/07/2025
Work to upgrade a flood-prone section of Stockbridge Road in Timsbury is set to begin later this month, as part of a joint project between the Environment Agency and Hampshire County Council to improve local flood defences. Starting on 28 July, the five-week scheme will deliver vital improvements a
04/07/2025
Oldham's town centre regeneration has taken a major step forward, with planning consent now granted for all six sites earmarked for transformation through the partnership between Muse and Oldham Council. The approval represents a significant milestone in the long-term vision to create a vibrant, in
04/07/2025
As temperatures soared during this week's heatwave, euroloo's innovative EcoWelfare units proved to be a game-changer on construction and outdoor sites across the country. Designed with comfort and sustainability in mind, these multi-functional welfare units offer everything teams need to stay pro
04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments. With a reputation for accuracy and reliability, Atlas
03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham. This marks the first phase of development at the 227-acre site. The scheme will deliver a range of purpose-built units from 4,820 sq ft
03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough. Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive
Efco UK LtdLakeside HireAqua Direct LtdStuart CanvasVinco SalesExcel Modular Buildings LimitedWestermans International LtdManchester Skip CompanySalford SkipsBest Brickwork