Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
08/02/2023

Work Commences On Road Duplication Scheme In Redland

Construction News Image
Redland City Council has announced that work has begun on a major road duplication scheme.

Work has commenced on stage one of the Wellington Street / Panorama Drive road duplication from Thornlands to Cleveland.

Redland City Mayor Karen Williams said the upgrade would bring many benefits, including improved traffic flow, improved environmental outcomes, and reduced vehicle operating costs for motorists.

He said: "Thousands of Redlands Coast motorists and other road users will benefit from this road upgrade, and it is encouraging to see the collaborative support from all levels of government to get the project started.

"The improvements here will make a difference to people’s daily lives, with a shorter journey to work for many, improved safety, and a decrease in peak-hour congestion that will see an associated environmental benefit.

"Quicker journeys and less time sitting in congested traffic will, I’m sure, be welcomed by many."

-- Advertisement --
hss

Division 3 Councillor Paul Golle said pre-construction site works had been underway since early 2022, paving the way for the main body of work to get started.

"The benefits from this important project have already commenced, with jobs and local businesses involved in the work to prepare the route," Cr Golle said.

"All up, around 140 jobs will be created by this project, a welcome boost for the local community in these challenging economic times."

Division 7 Councillor Rowanne McKenzie said improved safety was a key driver of the project.

"Improving road safety has been key to the planning of this project and with support from all levels of government this improved roadway will help ensure a safer environment for motorists, cyclists and pedestrians, now and into the future," Cr McKenzie said.

"We've been advised the road will remain open throughout works with limited disruption, ensuring minimal impacts will be experienced by road users and neighbours."

From 06 February, road users will see variable messaging signage, noise monitoring equipment, surveying and service investigations along the route before main construction work commences in several weeks’ time.

The Council has contracted Brisbane-based Georgiou Group Pty Ltd to deliver stage one, which is expected to be completed mid-2024.

This stage will see road duplication along Panorama Drive from Boundary Road to the Wellington Street intersection and on Wellington Street from the Panorama Drive intersection as far as South Street, Thornlands.

The intersections at Ziegenfusz Road/Panorama Drive and Panorama Drive/Wellington Street will also be upgraded.

Latest Construction News

31/05/2024

Esh Construction is to provide infrastructure upgrades to widen the existing A1290 at the International Advanced Manufacturing Park (IAMP). The IAMP is situated to the north of the Nissan Motor Manufacturing plant, adjacent to the A19 with excellent links to the A1(M), and is recognised as a ...
31/05/2024

Plans to build a new employment and enterprise campus at Chatham Waters have been given the go-ahead. Medway Council’s Planning Committee have approved plans this week to transform an 18acre Industrial Estate in Gillingham, Medway into a high-spec employment and enterprise campus called ...
31/05/2024

Construction work has commenced to develop the largest Padel Club in the north of England. Planning for The Padel Club's £2.5 million club and facility in TraffordCity was approved by Trafford Council in April this year and the club is wasting no time in bringing their much-anticipated venue to ...
31/05/2024

Building work is underway on Bolton’s first ever net zero homes in Farnworth town centre. Several of the townhouses currently under construction on site are being built to be emission free, slashing energy bills for their residents and supporting Bolton’s Climate Change Strategy and net zero ...
31/05/2024

Renault Trucks has today announced the UK’s first right hand drive E-Tech T is making its debut at the Road Transport Expo 2024, 4th to 6th June NAEC Stoneleigh. The fully electric E-Tech T joins a line-up that spotlights Renault Trucks’ strategic commitment to decarbonising transport, including ...
31/05/2024

Arts University Bournemouth (AUB) celebrated an important milestone in its decarbonisation project after the delivery and installation of Air Source Heat Pumps (ASHPs) and Water Source Heat Pumps (WSHPs) on campus. The installation is a crucial part of AUB’s plan to lower fossil fuel use on the ...
31/05/2024

Suffolk County Council has announced that testing and commissioning of the Gull Wing bridge's bascule section is continuing. Following the 3-week closure of Lake Lothing in March 2024 for the installation of the final bascule span, activity has been focused on ensuring the bridge performs as ...
31/05/2024

All eyes are on the home's hallway, according to new data from the UK's leading supplier and distributor of radiators, UK Radiators. Using data from Pinterest, UK Radiators found searches for the term 'entrance hall décor' have increased 50 per cent over the last month. And one simple style-fix ...
30/05/2024

Caddick Construction has been selected to develop Rivington Chase, working on behalf of development partners, Bolton at Home and Irwell Valley Homes, to build 116 new homes in Horwich. Work at the former Loco Works will see Caddick resume work to regenerate the former railway works, where ...
30/05/2024

A demolition project at Sheffield Forgemasters' Brightside Lane facility has cleared the way for the next phase of constructing the UK's largest open die forge. Covering an area of 150 by 84 metres, the site is now undergoing piling work to lay the foundations for a 13,800-square-meter building. ...
BRICOFLOR UKGo Geothermal LtdAqua Direct LtdThink Construction Skills Ltd.JWCEfco UK LtdLakeside HirePerformboardPump SuppliesSuperior Resin Solutions UK Ltd
Terms and Conditions
2024/06/01 10:49:14