Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

12/11/2020

Kawneer Glazing Systems Showcase Leading-Edge Automotive Research

Aluminium curtain walling by leading UK manufacturer Kawneer, has helped an award-winning and cutting-edge combination of industry and academia achieve a BREEAM "Excellent" rating.

The National Automotive Innovation Centre (NAIC), at the University of Warwick, is one of the largest centres of its kind in Europe, and a partnership between WMG (University of Warwick), Jaguar Land Rover and Tata Motors UK and features Kawneer's AA®110 mullion-drained curtain wall.

The curtain wall system with 65mm sightlines, occasional fritting and in places a translucent inner layer, has been used at triple height on the entrance façade, as ribbon glazing on the ground and third floors, and as roof lights underneath the over-sailing roof.

Delivered between January 2015 and August 2018, using BIM by main contractor Balfour Beatty, the project was the first live construction site to trial BIM-based meeting space and such was the success of BIMspace, a next-generation facility camouflaged in a site cabin, it won BIM Initiative of the Year at the Building Awards.

Designed to provide a national focus for expertise in automotive R&D, it accommodates up to 1,000 technologists, academics, designers, students and engineers, with the aim of fostering collaboration to develop and utilise new breakthrough vehicle technology.

The L-shaped building is four storeys high and is 33,000m2, with a full-height atrium and a glulam and steel composite diaphragm roof. The Kawneer glazing, which plays a key role in the project by allowing natural light to penetrate the deep-plan building and providing views in as well as out, was divided into several equally key components.

At the entrance façade, the quadruple-height Kawneer curtain walling clearly demarcates the public entrance area to the building, allowing for views in and out from the main entrance space/exhibition, while triple-height glazing mirrors the glazed wall to the engineering hall directly inside the building. Glazing in this area is bolted back to full-height rectangular steel sections and interfaces with revolving doors at ground level.

-- Advertisement --
hss

The ground-floor ribbon glazing linking into the entrance facade glazing, wraps around the main public front to the building, providing a fully-glazed facade to the cafe as well as the student projects space.

Generally single storey in height with elements of double storey glazing at key points along its length, some panes of glass are fritted at 60% grey to provide shading, and in more commercially sensitive areas and service areas, an interlayer was added to make the panels translucent. Incorporated into the Kawneer system are a series of glass louvres controlled by an actuator providing smoke ventilation in case of a fire in the exhibition area.

On the majority of the third floor, a ribbon of capped curtain walling provides a visual break between the timber cladding panels and the glulam roof which appears to float over the building, while allowing the third-floor office spaces to take advantage of panoramic views into the surrounding landscape. Here, the Kawneer curtain walling also deals with the deflection of the dramatic glulam roof which can deflect by up to 50mm.

The Kawneer capped curtain wall also forms punched windows in the brickwork and timber cladding panels, allowing natural light into, and views out of, offices, key working spaces and stairwells. Here, the system allows for deflection of the timber cladding panels, with glass louvres incorporated into the Kawneer system in the stairwells to provide smoke ventilation in case of fire.

Finally, the Kawneer curtain wall forms roof lights in the design studios, providing north lights in a series of single and double-height design spaces.

Glazing mullions were positioned to reflect the rhythm of the anodised aluminium mesh cladding around the first and second storeys, and the curtain walling was powder coated to match the colour of the structural steel elements of the building.

Environmental sustainability influenced the choice of materials and construction methods, including the in-situ concrete frame and glulam roof structure which was renewably sourced with low embodied energy. The roof also houses 1,900m2 of photovoltaic panels to reduce the energy load.

Cullinan Studio, who were the architects, said: "We needed to meet green guide ratings for our BREEAM assessment and the Kawneer curtain walling helped us achieve this.

"The materials - anodised aluminium, glass, glazed brickwork and engineered timber - are enduring and can be built with a high degree of precision - all project excellence in engineering.

"The silicone jointing along the ground-floor glazing and entrance facade helped create the illusion of a seamlessly glazed wall while simultaneously dealing with the movement of the building. In order to achieve the double and quadruple-height areas of glazing, the system was fixed back to steel sections."

www.kawneer.co.uk

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
Pro Structures LtdBRICOFLOR UKLakeside HireTip Top Toilets LtdNationwide Boiler HireEnviro Chill LTDOrchard Hire and SalesAbrasives worldAmiga Scaffolding LtdP C Lifting Services LTD