Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 146,423 companies....

Construction News

16/05/2019

Introducing A New Way To Manage Building Evacuations

Being caught up in a fire, explosion, bomb threat or similar, is a very rare occurrence for most of us. Often, in a real time emergency evacuation, people will do the wrong thing or simply not know what to do at all.

Emergency drills should be held to practice the fire and evacuation routine at least twice a year, and in high-risk premises more often. These drills will indicate the success or otherwise of the fire routine and emergency plan, which enable companies to make the appropriate adjustments.

We can instil the need to refrain from delaying the evacuation - by leaving personal belongings behind, not wandering floors or attempting to return for any reason, but when faced with the thought of imminent danger human behaviour can be very unpredictable.

Once out of the building, many organisations conduct evacuation role calls (name calls) to ensure everyone is out, but these can be time consuming and mistakes can be made. Should anyone be missing, a role call does not give a clear indication of where that person might be.

This can all delay and falsify any rescue attempts by the emergency services.

-- Advertisement --
hss

But there is another way……

Marsden Fire Safety are delighted to introduce TagEvac, a revolutionary evacuation management system that gives staff and Emergency Services real time information about a buildings evacuation process, eliminates the need for time consuming role calls and helps to eliminate human error.

How does it work?

Firstly, the building is divided into evacuation zones and a 'TAG Station', complete with removable magnetic tags, is placed outside each zone. A fire warden (or wardens) will then be appointed for these areas.

In an emergency, the zone is visually checked by the appointed person, using the sweep method of evacuation. When clear, the tag is removed from its 'TAG Station' to reveal a red zone checked panel. The tag is then taken to the central control board, confirming at both locations that the zone is clear.

Simply put, while you're in the building you can tell in an instant which zones have been checked, by having a quick look at its tag station and once you're safely outside, a quick glance at the control board means you have a reliable overview of the situation.

This information can be easily relayed to emergency services to allow them to prioritise their efforts accordingly.

TagEvac is deliberately low-tech and intuitive to help avoid 'system failure' in an emergency. It's easy to install, simplifies training of Fire Warden and helps organisations achieve best practise.

That's why it is the trusted management solution for industry leaders such as Coca-Cola, Lloyds of London, Nationwide, London Underground and The National Archives.

Tagevac is available as an 'off the shelf' self-customisable system or we can work with you to develop a custom built system to fit your specific needs - whether it be in a single site or across multiple locations.

For more information or to discuss requirements contact:

Marsden Fire Safety

www.marsden-fire-safety.co.uk

[email protected]

Latest Construction News

24/07/2026
Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre (CPNSC), marking a major milestone in securing the long-term future of one of the UK's most significant sporting venues. The decision allows the project to move forward to the next phase, creating
Read More
24/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
Network Rail has confirmed that Botley Road in Oxford will remain closed beyond the end of August, delaying the previously planned reopening agreed when the programme was revised in January 2025 to prioritise getting traffic moving again. During recent drainage excavation for the new road layout, t
Read More
24/07/2026
Network Rail and The Arch Company have agreed a multi-million-pound transaction to transfer a selection of London property assets into Arch Co's ownership, marking a further milestone in their ongoing partnership. The package comprises a mix of railway arches and other investment properties — inclu
Read More
24/07/2026
More than 100 builders came together in Oxfordshire for the FMB's National Conference, which doubled as a milestone celebration of the Federation's 85 years supporting the trade. Staged on 9–10 July at the Oxford Belfry Hotel & Spa, the event welcomed 156 delegates for a Business Conference under t
Read More
24/07/2026
Established in 1996, The Access Flooring Company—distinguished from copycat businesses—marks three decades of excellence by reinforcing its position as the UK's premier specialist in raised access flooring, raised floor configurations, and advanced pedestal floor system technologies. Marking its la
Read More
24/07/2026
NFRC is urging members to help shape a new Government strategy for built environment professions, as the sector adjusts to the Building Safety Regime and renewed expectations on competence, professionalism and accountability. NFRC recently took part in a Build UK forum with the Building Professions
Read More
24/07/2026
Fire safety in homes and buildings is under closer scrutiny than ever. Whether you’re replacing a door, adding a glazed screen or partitioning a space, using the correct fire-rated glass is essential. The Glass Shop Online supply certified fire-rated glass and help customers navigate the requiremen
Read More
23/07/2026
Mace Consult has been appointed across six lots of Transport for London's (TfL) Professional Services Framework 3 (PSF3), strengthening a long-running collaboration and positioning the firm as a leading delivery partner on major infrastructure across the capital. Under the framework, Mace Consult w
Read More
BRICOFLOR UKPro Structures LtdLakeside HireB&L Shutters LtdUK National RoofingDSA SolarSimplify StructuresE-Tech ComponentsStakapal LimitedJesse Blinds & Shutters Ltd