Being caught up in a fire, explosion, bomb threat or similar, is a very rare occurrence for most of us. Often, in a real time emergency evacuation, people will do the wrong thing or simply not know what to do at all.
Emergency drills should be held to practice the fire and evacuation routine at least twice a year, and in high-risk premises more often. These drills will indicate the success or otherwise of the fire routine and emergency plan, which enable companies to make the appropriate adjustments.
We can instil the need to refrain from delaying the evacuation - by leaving personal belongings behind, not wandering floors or attempting to return for any reason, but when faced with the thought of imminent danger human behaviour can be very unpredictable.
Once out of the building, many organisations conduct evacuation role calls (name calls) to ensure everyone is out, but these can be time consuming and mistakes can be made. Should anyone be missing, a role call does not give a clear indication of where that person might be.
This can all delay and falsify any rescue attempts by the emergency services.
But there is another way……
Marsden Fire Safety are delighted to introduce TagEvac, a revolutionary evacuation management system that gives staff and Emergency Services real time information about a buildings evacuation process, eliminates the need for time consuming role calls and helps to eliminate human error.
How does it work?
Firstly, the building is divided into evacuation zones and a 'TAG Station', complete with removable magnetic tags, is placed outside each zone. A fire warden (or wardens) will then be appointed for these areas.
In an emergency, the zone is visually checked by the appointed person, using the sweep method of evacuation. When clear, the tag is removed from its 'TAG Station' to reveal a red zone checked panel. The tag is then taken to the central control board, confirming at both locations that the zone is clear.
Simply put, while you're in the building you can tell in an instant which zones have been checked, by having a quick look at its tag station and once you're safely outside, a quick glance at the control board means you have a reliable overview of the situation.
This information can be easily relayed to emergency services to allow them to prioritise their efforts accordingly.
TagEvac is deliberately low-tech and intuitive to help avoid 'system failure' in an emergency. It's easy to install, simplifies training of Fire Warden and helps organisations achieve best practise.
That's why it is the trusted management solution for industry leaders such as Coca-Cola, Lloyds of London, Nationwide, London Underground and The National Archives.
Tagevac is available as an 'off the shelf' self-customisable system or we can work with you to develop a custom built system to fit your specific needs - whether it be in a single site or across multiple locations.
For more information or to discuss requirements contact:
Marsden Fire Safety
www.marsden-fire-safety.co.uk
info@marsden-fire-safety.co.uk
Construction News
16/05/2019
Introducing A New Way To Manage Building Evacuations


03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham.
This marks the first phase of development at the 227-acre site.
The scheme will deliver a range of purpose-built units from 4,820 sq ft

03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough.
Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive

03/07/2025
Plans to boost North Lincolnshire's transport infrastructure have reached a significant milestone with the completion of Phase 1 of the M181 'southern junction' project.
Led by North Lincolnshire Council in partnership with National Highways, the multi-million-pound scheme includes the construction

03/07/2025
The multi-million-pound refurbishment of Watford Colosseum has reached practical completion, with the historic venue now officially handed over to operator AEG Presents UK.
Led by Watford Borough Council and delivered by Morgan Sindall Construction's Northern Home Counties division, the major upgra

03/07/2025
Sigma Capital Group has announced the acquisition of four new development sites worth around £100 million in gross development cost (GDC), continuing its strategic partnership with Vistry Group.
The projects will deliver 415 new single-family rental homes across England, further cementing Sigma's

03/07/2025
A major £215,000 upgrade to the Winsover Road level crossing in Spalding is set to begin this Saturday night, 5 July, aimed at improving rail reliability and ensuring safety for motorists, pedestrians and rail users.
The essential works will see a full replacement of the life-expired crossing surfa

03/07/2025
A former office building in Cardiff Bay has been given a new lease of life, with 33 high-quality council apartments now handed over to Cardiff Council as part of a wider redevelopment to deliver 78 new homes.
The Scott Harbour building, once a commercial office block, is undergoing a major conversi

03/07/2025
Social value specialist Loop has launched the UK's first monetised social value metrics tool tailored specifically for the housing sector, offering developers a new, data-driven approach to strengthen planning applications, engage communities and showcase real-world benefits.
Developed in partnersh

02/07/2025
Construction is officially underway on the new Whitefield Community Fire Station, part of Greater Manchester Fire and Rescue Service's (GMFRS) £38 million Estates Improvement Programme.
Led by Robertson Construction North West, the project will replace the former fire station on Bury New Road with

02/07/2025
Hull City Council has officially appointed Esh Construction to lead a major repair and strengthening programme on Drypool Bridge, one of the city's key transport links.
The project will be delivered in partnership with engineering consultancy Mason Clark Associates.
Work will begin on the south s