Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,458 companies....

Construction News

23/03/2018

Work On £12.8m Office Redevelopment In Woking Complete

Construction News Image
Work on a £12.8 million office building redevelopment in Woking is now complete.

The scheme was delivered by Gilbert-Ash at Victoria Gate on behalf of Aviva Investors.

Designed by international design practice Scott Brownrigg, the project involved extending each level of the eight-storey commercial office and retail facility, as well as adding a new floor and increasing the building capacity by 25%.

In addition, the original pitched roof has been replaced and the additional floor now incorporates an open roof terrace, enabling an improved working environment for tenants including 360-degree views of the town.

Gilbert-Ash stated the double height reception area is set back at ground and first floor levels from the main building façade; highlighted with a high-end anodized finish. The revitalised building has been stripped back to its original frame to reveal a modern, progressive exterior, adding to its aesthetic appearance and increasing its appeal to the competitive commercial market.
-- Advertisement --
hss



A full height, glazed atrium has also been created at the centre of the scheme, flooding the lower floors with light. A curtain wall system with high-specification glass has also incorporated, enhancing the office experience for the building's end-users.

Emmett Holmes, Gilbert-Ash Project Manager, said: "It has been a very enjoyable experience working closely with Aviva Investors and Scott Brownrigg to refurbish and truly revive Victoria Gate, providing a stand-out, flexible space for its occupants.

"With a comprehensive extension, innovative façade and carefully considered fit out, we are proud of the unique working environment created in the heart of Woking."

Ed Hayden, Scott Brownrigg Director, said: "We were very excited to be given the opportunity to revisit one of our original office developments from 1985 and bring it into the 21st Century with Gilbert-Ash.

"The original building provided cutting edge office space in the 1980's and we were charged with re-imagining how the building could evolve for 2018 and recent developments in BCO standards."

(LM/MH)

Latest Construction News

04/07/2025
JV North has announced the list of contractors and consultants appointed to its £500 million social housebuilding framework, which aims to deliver around 3,000 homes across the North West over the next four years. The housing consortium, which includes 14 members, launched the procurement process i
04/07/2025
Work has officially started on preparing Eston Precinct for demolition, marking the first step in a major regeneration project led by Redcar & Cleveland Borough Council. Esh Construction has been appointed to deliver the scheme, which will begin with the safe removal of asbestos and the soft strip
04/07/2025
The Secretary of State for Energy Security and Net Zero hasgranted development consent for the Mona Offshore Wind Farm. The scheme, located in the Irish Sea, will deliver approximately 1,500MW of clean energy capacity and forms part of the Round 4 Offshore Wind Licensing Arrangements. The applicati
04/07/2025
The restoration of Chatham’s iconic Brook Theatre is officially underway, with the appointment of contractors to carry out the £21 million transformation of the 125-year-old building. Originally opened in 1899 as Chatham Town Hall, the Grade II listed Renaissance-style landmark has served the commu
04/07/2025
Work to upgrade a flood-prone section of Stockbridge Road in Timsbury is set to begin later this month, as part of a joint project between the Environment Agency and Hampshire County Council to improve local flood defences. Starting on 28 July, the five-week scheme will deliver vital improvements a
04/07/2025
Oldham's town centre regeneration has taken a major step forward, with planning consent now granted for all six sites earmarked for transformation through the partnership between Muse and Oldham Council. The approval represents a significant milestone in the long-term vision to create a vibrant, in
04/07/2025
As temperatures soared during this week's heatwave, euroloo's innovative EcoWelfare units proved to be a game-changer on construction and outdoor sites across the country. Designed with comfort and sustainability in mind, these multi-functional welfare units offer everything teams need to stay pro
04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments. With a reputation for accuracy and reliability, Atlas
03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham. This marks the first phase of development at the 227-acre site. The scheme will deliver a range of purpose-built units from 4,820 sq ft
03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough. Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive
Lakeside HireAqua Direct LtdEfco UK LtdStuart CanvasProcter Brother LTDAutolift UK (Custom Lifts Ltd)Bade Newby DisplayContrasol LtdStuart CanvasPortman Finance Group Ltd