Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,454 companies....

Construction News

17/11/2014

ISG To Deliver Development Programme In London

ISG has been chosen to deliver a development programme for the American School in London.

The contract is worth around £22 million.

Established in 1951 to provide an American education for students of all nationalities in London, the school has been located at its existing site in St John's Wood since 1971. Having undergone numerous enhancements over the past 40 years, the latest developments will see ISG construct a four-storey art block, a subterranean swimming pool and fitness suite and a new playground with external landscaping.

Phase one of the project involves the construction of a 13,000 sq ft art building with a neo-classical style limestone frontal elevation. The rear façade will feature curtain walling to enhance the volume of natural daylight within the structure and brise soleil to minimise solar gain, with a green sedum roof contributing to the design's BREEAM 'Very Good’' performance rating.
-- Advertisement --
hss



ISG will excavate the lower ground floor to the level of the existing school gym basement, with natural light provided by a linear roof light and glazing to the adjoining courtyard. This will accommodate a large ceramics studio with a kiln room, photography studios and toilets. Gallery space will be created on the ground floor, along with a design studio, staff work rooms and stores. First and second floor accommodation will comprise student art studio space.

An external courtyard at lower ground level will link the art building to the new pool and fitness suite that forms the second phase of the redevelopment. The 24,500 sq ft pool and fitness suite complex involves construction of a six lane, 25m swimming pool, a dance studio, fitness suite, changing facilities and ancillary storage, office and plant room areas. ISG will build the new facilities below the existing playground with lighting provided by carefully positioned light voids and roof lights.

Additional work within this phase of the project includes the creation of a new entrance hall in the main school building and the addition of curtain walling to its southern façade, along with recladding the existing external staircases with timber and stone finishes.

The landscaping works in phase three of the programme will see ISG raise the level of the existing playground above the pool and fitness suite by 900mm, with terraced edgings to incorporate the change of level into the existing layout. The work includes both hard and soft landscaping to complement existing mature trees and sports pitches.

(CD/MH)

Latest Construction News

04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments. With a reputation for accuracy and reliability, Atlas
03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham. This marks the first phase of development at the 227-acre site. The scheme will deliver a range of purpose-built units from 4,820 sq ft
03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough. Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive
03/07/2025
Plans to boost North Lincolnshire's transport infrastructure have reached a significant milestone with the completion of Phase 1 of the M181 'southern junction' project. Led by North Lincolnshire Council in partnership with National Highways, the multi-million-pound scheme includes the construction
03/07/2025
The multi-million-pound refurbishment of Watford Colosseum has reached practical completion, with the historic venue now officially handed over to operator AEG Presents UK. Led by Watford Borough Council and delivered by Morgan Sindall Construction's Northern Home Counties division, the major upgra
03/07/2025
Sigma Capital Group has announced the acquisition of four new development sites worth around £100 million in gross development cost (GDC), continuing its strategic partnership with Vistry Group. The projects will deliver 415 new single-family rental homes across England, further cementing Sigma's
03/07/2025
A major £215,000 upgrade to the Winsover Road level crossing in Spalding is set to begin this Saturday night, 5 July, aimed at improving rail reliability and ensuring safety for motorists, pedestrians and rail users. The essential works will see a full replacement of the life-expired crossing surfa
03/07/2025
A former office building in Cardiff Bay has been given a new lease of life, with 33 high-quality council apartments now handed over to Cardiff Council as part of a wider redevelopment to deliver 78 new homes. The Scott Harbour building, once a commercial office block, is undergoing a major conversi
03/07/2025
Social value specialist Loop has launched the UK's first monetised social value metrics tool tailored specifically for the housing sector, offering developers a new, data-driven approach to strengthen planning applications, engage communities and showcase real-world benefits. Developed in partnersh
02/07/2025
Construction is officially underway on the new Whitefield Community Fire Station, part of Greater Manchester Fire and Rescue Service's (GMFRS) £38 million Estates Improvement Programme. Led by Robertson Construction North West, the project will replace the former fire station on Bury New Road with
Aqua Direct LtdEfco UK LtdLakeside HireStuart CanvasCleanCube Mobile CleanroomsCleanroom SolutionsGuardtech GroupIsopod Rapid CleanroomsRapid Chiller RentalsMudfords Ltd