Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,458 companies....

Construction News

24/07/2012

Renderplas PVCU Shadow Gaps Make Interior Detailing Simple

Renderplas has launched two new PVCu plasterers' beads which make it quick and easy to create neat 'shadow gaps' at plaster edges for a contemporary interior design effect. The new Shadow Gap profiles from Renderplas allow controlled gaps between 10mm and 20mm to be formed, for example, around door frames or where a plastered wall meets a ceiling or finished floor. These new additions to the Renderplas range are available in a choice of L profile - for use where the adjacent material is designed to be seen; or U profile to ensure a neat channel with perfect parallel lines adjacent to surfaces such as un-edged plasterboard.

Shadow gaps can provide the perfect finishing touch to a minimalist interior. They are a popular design feature with many architects and interior designers but are often regarded as tricky and time consuming by plasterers. The new Shadow Gap profiles from Renderplas offer a simple and less labour-intensive way to get these gaps exactly right - saving time and effort on site. The U profile provides a gap of 15mm, while the L profile can be used to create a gap up to 20mm. The L profile is scored every 5mm along its hidden face so it can easily be trimmed with a sharp knife to form a 10mm or 15mm gap to suit different design requirements. Each Renderplas Shadow Gap profile is 15mm deep, which is the preferred depth for this application and ideal for normal lighting conditions.
-- Advertisement --
hss



Shadow Gaps are fashionable features for modern interiors and are often specified in place of skirting boards or architrave. In addition to the more traditional type of shadow gap at the top or base of a plastered wall, Renderplas Shadow Gap profiles offer a simple solution to forming a variety of interior design effects, says Daniel Leedham-Green, Managing Director of Renderplas. “For example, they can provide a shadow gap above a skirting board or a clean channel mid-wall in which a rope light can be inserted. With our new PVCu profiles these small features are no longer a big challenge for plasterers.”

Please send reader enquiries to:

Richard Harley

Renderplas Limited

Number 2

70-72 High Street

Bewdley

Worcestershire

DY12 2DJ

T: 01299 888333

F: 01299 888234

enquiry@renderplas.co.uk

www.renderplas.co.uk

Latest Construction News

04/07/2025
JV North has announced the list of contractors and consultants appointed to its £500 million social housebuilding framework, which aims to deliver around 3,000 homes across the North West over the next four years. The housing consortium, which includes 14 members, launched the procurement process i
04/07/2025
Work has officially started on preparing Eston Precinct for demolition, marking the first step in a major regeneration project led by Redcar & Cleveland Borough Council. Esh Construction has been appointed to deliver the scheme, which will begin with the safe removal of asbestos and the soft strip
04/07/2025
The Secretary of State for Energy Security and Net Zero hasgranted development consent for the Mona Offshore Wind Farm. The scheme, located in the Irish Sea, will deliver approximately 1,500MW of clean energy capacity and forms part of the Round 4 Offshore Wind Licensing Arrangements. The applicati
04/07/2025
The restoration of Chatham’s iconic Brook Theatre is officially underway, with the appointment of contractors to carry out the £21 million transformation of the 125-year-old building. Originally opened in 1899 as Chatham Town Hall, the Grade II listed Renaissance-style landmark has served the commu
04/07/2025
Work to upgrade a flood-prone section of Stockbridge Road in Timsbury is set to begin later this month, as part of a joint project between the Environment Agency and Hampshire County Council to improve local flood defences. Starting on 28 July, the five-week scheme will deliver vital improvements a
04/07/2025
Oldham's town centre regeneration has taken a major step forward, with planning consent now granted for all six sites earmarked for transformation through the partnership between Muse and Oldham Council. The approval represents a significant milestone in the long-term vision to create a vibrant, in
04/07/2025
As temperatures soared during this week's heatwave, euroloo's innovative EcoWelfare units proved to be a game-changer on construction and outdoor sites across the country. Designed with comfort and sustainability in mind, these multi-functional welfare units offer everything teams need to stay pro
04/07/2025
Atlas Site Engineering, a trusted name in precision setting out and site engineering services, continues to support the construction industry with expert solutions ranging from small residential extensions to multi-storey high-rise developments. With a reputation for accuracy and reliability, Atlas
03/07/2025
Associated British Ports (ABP) has submitted a reserved matters application for 103,000 sq ft of speculative industrial and logistics space at Helm @ Immingham. This marks the first phase of development at the 227-acre site. The scheme will deliver a range of purpose-built units from 4,820 sq ft
03/07/2025
First Choice Homes Oldham (FCHO) is set to begin a major new phase of energy efficiency upgrades this month, with a £6.1 million investment aimed at improving 645 homes across the borough. Starting 14 July, properties in Abbey Hills, Roundthorn, Shaw, and several estates in Chadderton will receive
Aqua Direct LtdStuart CanvasLakeside HireEfco UK LtdApollo Scaffolding Ties LtdTheos Timber Ltd (Manchester)Kedel LtdNorthern ContainersCaras UK LtdGated Security Designs