Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
09/08/2007

Shackerley’s Ceramic Granite Makes An Impact On The Clyde

With a sleek black Sureclad ceramic granite ventilated rainscreen, Shackerley has helped RMJM Architects in Glasgow transform Capitol Park, a new build development of urban ‘crash pads’, into a landmark building on the Clyde waterfront.

The 36-unit development, designed for Forrestgate Developments, is adjacent to Festival Park, the Media Village and the ‘Clyde Arc’ bridge leading to Glasgow’s city centre. RMJM designed the building to connect both with the contemporary architecture along the waterfront and with the Clyde’s rich industrial heritage. One street-facing elevation is finished in red brick, in the character of neighbouring warehouses, and Shackerley’s black, imposing ceramic granite rainscreen façade completely clads the other, in sympathy with the new riverfront buildings and studios in the media quarter.

-- Advertisement --
hss

RMJM Architect Craig Thomson commented: “The sleek polished appearance of the ceramic granite façade has the dramatic visual impact we wanted to achieve, and the large format panels with their reflective surface provide a perfect contrast to the grain, colours and standard unit size of the red brick. It has made the building relate to its environment in a highly contemporary way.”

The polished rainscreen façade was installed by cladding installation specialists RIG Construction Elements Ltd using Shackerley’s Sureclad carrier support system, a framework of high grade aluminium vertical and horizontal rails to which the ceramic granite panels were mechanically fixed using patented undercut anchors. In this instance the framework was successfully installed on a timber kit building structure with adjustments made to cater for long term kit settlement and the spread of fire.

Dougie McCallum of RIG commented: “The attention to detail and close cooperation of all parties at the planning stage made our role more straightforward, minimising the number of panels requiring special cuts and reducing wastage and overall assembly time. Although our team have never worked with Shackerley’s Sureclad system before we found it very flexible and had no problems achieving the exact aesthetic design envisaged by the architects.”

Craig Thomson concluded: “In an overcrowded residential market place Capitol Park definitely stands out from the crowd and our clients are delighted with the finished results. We are now considering using the Sureclad ceramic granite rainscreen system for a number of other projects that we have in development.”

(CD)

Latest Construction News

03/05/2024

Construction firm GRAHAM has started building work on a £19 million Community Diagnostic Centre (CDC) in Workington town centre. The Centre will be located next to Cumberland Council's government-funded Innovation Hub which is also under development in Central Way. GRAHAM is the principal ...
03/05/2024

Significant progress is being made on a new £2 million recycling centre in Haverhill. Construction works are being completed by FCC Environment and its contractor DXI Regeneration Ltd, on behalf of Suffolk County Council. The facility will be operated by FCC Environment, which manages all of ...
03/05/2024

Midlands contractor G F Tomlinson has started work on a new primary school in Dunstall Park Estate, Tamworth. The work is taking place on behalf of Staffordshire County Council alongside project managers and concept architects, Entrust. The project was procured through the Constructing West ...
03/05/2024

Galliford Try has made another step in its carbon reduction journey with the deployment of a new digital platform across its Infrastructure projects. The platform, Qflow, automates data capture and processing by extracting information from delivery and waste tickets, using Artificial Intelligence ...
03/05/2024

Underfloor heating is the most efficient method of heating a room and is fast becoming the most popular option for new building and property refurbishments. As a result, more trade professionals are being asked to install underfloor heating and self-builders and renovators are using it as their ...
03/05/2024

Farrans is making significant progress at Barsham Water Treatment Works in Suffolk, where its client Essex and Suffolk Water is investing more than £49 million in upgrades to the site. Due to be complete in 2025, the project will provide improvements to the resilience and quality of drinking ...
03/05/2024

Work has been completed on a new bridleway bridge at Lindsells Level Crossing in Biggleswade, Bedfordshire. Work started in December 2022 on the fully accessible bridleway bridge which allows pedestrians, horse riders, cyclists and other users to safely cross the railway line, providing better ...
03/05/2024

Ideal Work UK has unveiled Microtopping®, a revolutionary cementitious coating that delivers the sleek, sophisticated look of polished concrete with unparalleled versatility and ease of application. ...
03/05/2024

Building work has commenced on a new development in Oundle that will bring self-contained extra care apartments to the area along with 62 homes and three self-build plots. Persimmon's East Midlands team have started preparing the Barnwell Walk site off St Christopher’s Drive in the town and expect ...
03/05/2024

Morgan Sindall has been appointed to two new Pagabo frameworks. The two frameworks are valued at £1.6 billion each and will run for four years. It was confirmed earlier this month that Morgan Sindall had been appointed to the new £1.6bn Healthcare Decarbonisation Framework from Pagabo, which has ...
Efco UK LtdJWCBRICOFLOR UKAqua Direct LtdLakeside HireThink Construction Skills Ltd.Flames Of SheffieldJP Concrete Products Ltd.Atspeed Steels & LintelsAutolift UK (Custom Lifts Ltd)
Terms and Conditions
2024/05/06 22:13:03