Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 147,686 companies....

Construction News

18/06/2026

Winvic Appointed to Construct £130m Build-to-Rent Scheme in Leeds

Construction News Image

Winvic Construction Ltd has secured a contract to construct a landmark £130m Build-to-Rent (BTR) project located in Leeds city centre. The main contractor, which specialises in designing and executing public and private sector civil engineering and construction projects, received the appointment after Gateway 2 approval was granted.

The project is being delivered on behalf of Lisbon Street Developments Limited, which is a joint venture between Helios Real Estate and Marrico Asset Management. Construction is scheduled to begin in the final quarter of this year, with the plans encompassing 578 apartments divided between two residential structures. This project follows Winvic's recent work on the very same site, where it finished a 548-bed Purpose Built Student Accommodation (PBSA) scheme six months ago.

Situated on Lisbon Street, the scheme features a 33-storey tower and a 22-storey tower, both positioned over a shared basement and a single-storey podium. Two commercial units and resident amenity spaces will be housed within the podium to create a mixed-use environment. The basement will offer car parking spaces, ancillary facilities, and direct entry points into both towers. Additionally, east-facing balconies and a roof terrace have been integrated into the design to enhance outdoor living space and optimise views.

-- Advertisement --
hss

Sustainability targets for the project include achieving a Home Quality Mark (HQM) 3.5 star certification. To lower operational carbon emissions and supply sustainable power during occupancy, the buildings will utilise decentralised Air Source Heat Pumps (ASHP). On-site renewable electricity will be produced via photovoltaic (PV) systems to decrease grid dependency, while enhanced glazing specifications and building fabric will lower cooling and heating demands to boost energy performance.

Furthermore, Winvic has worked alongside Leeds City Council to formulate a Social Value Plan. The initiative intends to deliver measurable benefits to the local area, including work experience placements, new employment opportunities, volunteering initiatives, educational engagement, and apprenticeships.

The contract expands Winvic's footprint in the BTR market, with its Multi-Room division having completed 15,000 beds across the UK to date.

Mark Jones, Managing Director for Multi-Room at Winvic, said: "Working in partnership with Marrico Asset Management, we look forward to delivering a high-quality residential scheme that will contribute to Leeds' continued growth and provide homes in a thriving city centre location.

"Following our recent work on the same site, this development is a great example of our capability. The scheme's scale, complexity and prominent city centre location make it an exciting addition to our portfolio."

Richard Bland, Partner at Marrico Asset Management Limited said: "Gateway 2 approval moves the scheme into delivery. We appointed Winvic following their work on the PBSA scheme on the same site, which gave us confidence in their ability to deliver here. The BTR towers are the third scheme underway on the former International Swimming Pool site, following student scheme and the aparthotel now under construction. Together with Helios, we are focused on bringing forward 578 well-built rental homes in a central Leeds location"

Latest Construction News

26/06/2026
CField Construction has been officially appointed by Fusion Group as main contractor for two major UK residential developments, with a combined contract value of £176 million. The schemes will deliver purpose-built student accommodation (PBSA) and affordable housing in London and Glasgow, with com
Read More
26/06/2026
A permanent riverside link between the Hythe and Rowhedge is back in place after Colchester City Council completed Phase Two of the Fieldgate Quay restoration, drawing a line under years of disruption caused by structural failure and temporary diversions. The last phase concludes repairs to damage
Read More
26/06/2026
Holcim UK has secured a competitive tender to supply sustainable readymix concrete for the Smithfield Lofts residential development in Digbeth, Birmingham’s Creative Quarter, as part of the wider £1.9 billion Smithfield regeneration scheme. The Smithfield Lofts project, delivered by principal contr
Read More
26/06/2026
Galliford Try has been named among the UK's Top 50 Employers of Veterans for 2026, securing 20th place in the prestigious GREAT British Employers of Veterans ranking — an improvement of 20 places on last year. The 50 GREAT British Employers of Veterans is widely regarded as the UK’s leading benchma
Read More
26/06/2026
Councillors Linda Smith and Nigel Chapman joined representatives from OX Place – Oxford City Council's wholly owned housing company – Oxford City Council, Homes England and construction partner Cantay Estates for a ribbon-cutting at Keepers Place on Wednesday 24 June, marking completion of the first
Read More
26/06/2026
A new Community Diagnostic Centre (CDC) at St Margaret's Hospital has officially opened, expanding access to diagnostic services for local residents and supporting efforts to provide healthcare closer to patients' homes. The facility, delivered by Morgan Sindall Construction's Essex business for Th
Read More
26/06/2026
Kensington and Chelsea Council has approved a £1.3 million refurbishment of the near-120-year-old Chelsea swimming pool, aiming to preserve its heritage while cutting energy and water use. Opened in April 1907, the facility will have its pool plant and roof replaced, the swimming pools' surfaces re
Read More
26/06/2026
A major agreement has been concluded with BAM to undertake the initial phase of civil engineering for the northern converter station on the proposed Eastern Green Link 3 (EGL3), marking a significant step forward for what is set to be the UK’s largest electricity transmission project. Through an Ea
Read More
26/06/2026
Phased works will start next week at Northampton Central Library to safeguard the Grade II-listed building, modernise facilities and bring key services together under one roof. The refurbishment will be carried out in stages over the next 12 months so the library and Registration Service can remain
Read More
26/06/2026
Multi-Shower is introducing its maintainable shower system to the UK construction, facilities and building management sectors. Designed as an alternative to traditional fixed spray plate shower heads, Multi-Shower uses a replaceable insert system developed to support routine maintenance and long-te
Read More
BRICOFLOR UKPro Structures LtdLakeside HireFP McCann Ltd1st Containers UK LtdFLINTHAM CABINS LTDValcanMeadowson LtdRT Farm & Industrial Buildings LtdMr Trax Curtain & Blinds Solutions