Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 147,686 companies....

Construction News

17/09/2025

A Safe, Effective & Uncomplicated Escape From Hazardous Environments - Dräger CF15 Escape Set

The Dräger CF15 Escape Set is a Self Contained Breathing Apparatus Set (SCBA) which provides upto 15 minutes of air supply.

It allows for a safe, effective and uncomplicated escape from hazardous environments, and can be easily operated with minimal training.

In emergency situations, conditions can deteriorate rapidly. The air is suddenly filled with smoke or toxic fumes and rapid escape is the only available option. The Dräger CF15 Self Contained Breathing Apparatus Set is highly visible and was designed to be suitable even for people with spectacles or facial hair. When opened, the Dräger Saver CF is automatically activated and begins feeding a continuous supply of breathing air. The Dräger CF15 Escape Set gives the wearer the precious additional time needed to exit the area.

-- Advertisement --
hss

UP TO 15 MINUTES OF LIFESAVING AIR

The Dräger CF15 Breathing Apparatus Set utilizes a simple, fail-safe reducer system with excellent flow characteristics, providing a consistent rate of air flow until the cylinder is completely empty. An alarm whistle sounds before the air supply is exhausted. It is equipped with a cylinder which holds a 15 minute supply of air. The flame-retardant hood incorporates a large visor for maximum peripheral vision.

We also hire this for £20 per week. Click here for further information.

Latest Construction News

26/06/2026
CField Construction has been officially appointed by Fusion Group as main contractor for two major UK residential developments, with a combined contract value of £176 million. The schemes will deliver purpose-built student accommodation (PBSA) and affordable housing in London and Glasgow, with com
Read More
26/06/2026
A permanent riverside link between the Hythe and Rowhedge is back in place after Colchester City Council completed Phase Two of the Fieldgate Quay restoration, drawing a line under years of disruption caused by structural failure and temporary diversions. The last phase concludes repairs to damage
Read More
26/06/2026
Holcim UK has secured a competitive tender to supply sustainable readymix concrete for the Smithfield Lofts residential development in Digbeth, Birmingham’s Creative Quarter, as part of the wider £1.9 billion Smithfield regeneration scheme. The Smithfield Lofts project, delivered by principal contr
Read More
26/06/2026
Galliford Try has been named among the UK's Top 50 Employers of Veterans for 2026, securing 20th place in the prestigious GREAT British Employers of Veterans ranking — an improvement of 20 places on last year. The 50 GREAT British Employers of Veterans is widely regarded as the UK’s leading benchma
Read More
26/06/2026
Councillors Linda Smith and Nigel Chapman joined representatives from OX Place – Oxford City Council's wholly owned housing company – Oxford City Council, Homes England and construction partner Cantay Estates for a ribbon-cutting at Keepers Place on Wednesday 24 June, marking completion of the first
Read More
26/06/2026
A new Community Diagnostic Centre (CDC) at St Margaret's Hospital has officially opened, expanding access to diagnostic services for local residents and supporting efforts to provide healthcare closer to patients' homes. The facility, delivered by Morgan Sindall Construction's Essex business for Th
Read More
26/06/2026
Kensington and Chelsea Council has approved a £1.3 million refurbishment of the near-120-year-old Chelsea swimming pool, aiming to preserve its heritage while cutting energy and water use. Opened in April 1907, the facility will have its pool plant and roof replaced, the swimming pools' surfaces re
Read More
26/06/2026
A major agreement has been concluded with BAM to undertake the initial phase of civil engineering for the northern converter station on the proposed Eastern Green Link 3 (EGL3), marking a significant step forward for what is set to be the UK’s largest electricity transmission project. Through an Ea
Read More
26/06/2026
Phased works will start next week at Northampton Central Library to safeguard the Grade II-listed building, modernise facilities and bring key services together under one roof. The refurbishment will be carried out in stages over the next 12 months so the library and Registration Service can remain
Read More
26/06/2026
Multi-Shower is introducing its maintainable shower system to the UK construction, facilities and building management sectors. Designed as an alternative to traditional fixed spray plate shower heads, Multi-Shower uses a replaceable insert system developed to support routine maintenance and long-te
Read More
BRICOFLOR UKPro Structures LtdLakeside HireUK Shelving LtdAiros DevelopmentsAdam Fahey DesignLPH ConstructionGLW Engineering & Construction LtdThe Root Barrier StoreAbacus Garage Door Solutions Ltd