Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
01/02/2011

Socomec's Green Power UPS Now Comes In 320 & 400 kVA

Socomec UPS has just announced the extension to their Delphys Green Power Range, available up to a system size of 1.6 MVA.

Building on the strength and popularity of the Delphys Green Power 160 kVA and 200 kVA, the Socomec UPS range is now available in 320 kVA and 400 kVA units. Complete with true on-line, dual conversion, the highly efficient (96% verified by Bureau Veritas) uninterruptible power supply range of units now offer increased performance to ensure maximum availability with the best certified efficiency on the market.

Where innovation is driving the transition to green technologies aimed at reducing energy consumption, data centers play a primary role in the challenge of reducing CO² emissions and halving energy costs without sacrificing availability of service. It is with this demand that Socomec developed their Green Power range.

-- Advertisement --
hss

The Delphys Green Power UPS range has been upgraded with new functions, along with its new size extensions (320 and 400 kVA), specifically to meet a range of availability requirements and to configure a variety of power and redundancy architectures up to a maximum power of 1.6 MVA, with the option of choosing either a distributed or centralised bypass.

Incorporated with a special Energy Saver mode for high-reliability architectures with partial loads subject to frequent power variations, the Delphys Green Power ensures low consumption for end-users. For example, in a 2N architecture, the Energy Saver keeps only the UPS units strictly necessary for ensuring N+1 redundancy in operation and switches the others on only if necessary. Redundancy is guaranteed, but the units are made to work in conditions of maximum efficiency: maximum efficiency with maximum availability.

To find out more about the new Delphys Green Power UPS range extension, please visit: www.socomec.co.uk/green-power-ups, or contact Socomec UPS on Tel: 01285 863300 or email: info.ups.uk@socomec.com.

Latest Construction News

31/05/2024

Esh Construction is to provide infrastructure upgrades to widen the existing A1290 at the International Advanced Manufacturing Park (IAMP). The IAMP is situated to the north of the Nissan Motor Manufacturing plant, adjacent to the A19 with excellent links to the A1(M), and is recognised as a ...
31/05/2024

Plans to build a new employment and enterprise campus at Chatham Waters have been given the go-ahead. Medway Council’s Planning Committee have approved plans this week to transform an 18acre Industrial Estate in Gillingham, Medway into a high-spec employment and enterprise campus called ...
31/05/2024

Construction work has commenced to develop the largest Padel Club in the north of England. Planning for The Padel Club's £2.5 million club and facility in TraffordCity was approved by Trafford Council in April this year and the club is wasting no time in bringing their much-anticipated venue to ...
31/05/2024

Building work is underway on Bolton’s first ever net zero homes in Farnworth town centre. Several of the townhouses currently under construction on site are being built to be emission free, slashing energy bills for their residents and supporting Bolton’s Climate Change Strategy and net zero ...
31/05/2024

Renault Trucks has today announced the UK’s first right hand drive E-Tech T is making its debut at the Road Transport Expo 2024, 4th to 6th June NAEC Stoneleigh. The fully electric E-Tech T joins a line-up that spotlights Renault Trucks’ strategic commitment to decarbonising transport, including ...
31/05/2024

Arts University Bournemouth (AUB) celebrated an important milestone in its decarbonisation project after the delivery and installation of Air Source Heat Pumps (ASHPs) and Water Source Heat Pumps (WSHPs) on campus. The installation is a crucial part of AUB’s plan to lower fossil fuel use on the ...
31/05/2024

Suffolk County Council has announced that testing and commissioning of the Gull Wing bridge's bascule section is continuing. Following the 3-week closure of Lake Lothing in March 2024 for the installation of the final bascule span, activity has been focused on ensuring the bridge performs as ...
31/05/2024

All eyes are on the home's hallway, according to new data from the UK's leading supplier and distributor of radiators, UK Radiators. Using data from Pinterest, UK Radiators found searches for the term 'entrance hall décor' have increased 50 per cent over the last month. And one simple style-fix ...
30/05/2024

Caddick Construction has been selected to develop Rivington Chase, working on behalf of development partners, Bolton at Home and Irwell Valley Homes, to build 116 new homes in Horwich. Work at the former Loco Works will see Caddick resume work to regenerate the former railway works, where ...
30/05/2024

A demolition project at Sheffield Forgemasters' Brightside Lane facility has cleared the way for the next phase of constructing the UK's largest open die forge. Covering an area of 150 by 84 metres, the site is now undergoing piling work to lay the foundations for a 13,800-square-meter building. ...
Efco UK LtdGo Geothermal LtdAqua Direct LtdBRICOFLOR UKThink Construction Skills Ltd.Lakeside HireJWCTanks For Everything LtdCompass Protection Manufacturing LimitedContainex
Terms and Conditions
2024/06/01 07:22:06