Address
Mieszczanska 31
Poland
Poland
Wroclaw
50-201
About Artificial Modelling
We coordinate MEP systems for data centres, hospitals, pharmaceutical facilities, and complex infrastructure across the UK, Ireland, and Europe. Fixed price. Site-experienced. No surprises.
An in-house BIM coordinator costs €95K–€131K per year when you factor in salary, software licenses, hardware, training, and management overhead. Our fixed-price model delivers the same output at 40–55% less — with no recruitment risk, no bench time, and no surprise invoices.
Services
- MEP BIM Coordination — Revit, Navisworks, BIM360
- Fire Protection Design — sprinkler, detection, suppression
- 2D / 3D Modelling — LOD 200 through LOD 500
- Point Cloud Alignment — scan-to-BIM for existing buildings
- MEPF Automation — Dynamo scripts, clash detection workflows
Numbers that don’t need footnotes
4 days
A 19-day delay resolved in 4 days
A legal team had already drafted the Extension of Time addendum. We were brought in. The EOT was never filed.
286/337
First-time approval isn’t luck
On a 32-storey office block, 286 drawings approved with zero revisions on first submission. Remaining 51 resolved in 3 days.
0
The client stopped running QA checks
Automatic Fire eliminated their QA review process — our coordination was accurate enough to trust without verification.
What clients say
“AM’s prowess in BIM coordination for high-intensity MEP content sets them apart. An invaluable asset to any project team demanding expertise, precision, and successful delivery.”
— Tony Joyce, Director of Engineering, Jones Engineering Group
“What truly set AM apart was the transparency they maintained throughout. This fostered a sense of trust — laying a solid foundation for what I foresee as a long-term business relationship.”
— Declan Doyle, Executive Director, Varming Consulting Engineers
“We stopped running QA checks on AM’s outputs — consistently accurate enough to deploy without review. That’s a first for us.”
— Wojtek Kaczmarek, BIM Manager, Automatic Fire
Why fixed price changes everything
The hidden incentive problem with hourly billing:
- More hours = more revenue. Structural incentive to work slower.
- Scope creep is profitable. Every revision adds to the invoice.
- Cost is unpredictable. Invoice arrives 40% higher than approved.
- No shared goal. Optimising hours billed vs project success — direct conflict.
Aligned interests, every time (how we work):
- Faster delivery = better for us. We optimise for quality and speed.
- Rework is our problem. Fixed within scope — no surprise invoices.
- You know the cost before you start. Clear scope. Budget with confidence.
- We succeed when you succeed. The only incentive structure that works.
Background
15+ years of MEP site and coordination experience. Founded by Amer Agha — MSc in Applied BIM from TU Dublin, former BIM Project Information Manager at MAC Group (Ireland’s first BIM Level 2 certification from BRE), and Lead BIM Coordinator at Jones Engineering on the New Children’s Hospital Dublin (100+ federated models, BIM360 migration, zero data loss).
Sectors we know cold
- Data Centres
- Healthcare
- Pharmaceutical
- Commercial
- Education
- Mixed Development
Contact us → [email protected] | +48 534 455 075 | www.artificialmodelling.com
UK
Ireland
Scotland
London












