Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY

Sysdex

Sysdex Contact Details

Telephone
Click to view
Contact
Andy Pashouros
Email
Address
42a High Street
Broadstairs
CT10 1JT
United Kingdom

About Sysdex

Sysdex Modular Car Park Systems


We supply and install two types of car parks which both have multistorey capabilities.

Our patented clear span demountable GRP system has many advantages over traditional build car parks while our modular traditional build car park is "better by design" over others in the industry.

Install a truly demountable, clear span single deck or multi-story car park within weeks!
We also design and build modular traditional build car parks with innovative design features to set it apart from competitors

GRP Demountable car park
There are very few components within the system that allow for repetitive and fast fabrication.
Fewer components also mean that design flexibility is achieved at very little cost.
With our off-site construction, there is less disruption on-site so that existing car parks can function for longer to maintain revenue.
As our GRP panels are 1/10th the weight of concrete panels, less transport is required to deliver components to a site.
The lightweight system requires less in terms of foundations and therefore significant savings can be made and time saved in the ground.

Modular traditional build car parks
At Sysdex we have looked at everything that is wrong with traditional car parks and reinvented each component to provide a solution that is better by design.

Our ramps are manufactured from galvanised open grid grate which is not susceptible to dynamic loads in the way that concrete is and therefore cracking to the ramp is eliminated.

The ramps are not affected by adverse weather and do not require de-icing during the winter months.

Our concrete slabs are uniquely cast in preformed bays which allows for controlled cracking, random cracking is far more difficult to waterproof and is prone to failure.

To simplify fabrication and steel erection we have designed the steelwork connections for the worst-case scenario we use six bolts all one size.

GRP Demountable system
Clear span
Our GRP system utilises hollow steel sections for its lightweight qualities, this minimises the number of internal columns whilst still providing a clear internal span of 15.6m and 16.1m. The perpendicular column grid has centers at 2.4m multiples up to 12m in span, this allows maximum flexibility and can cater for all manner of layouts and ground obstacles.

Flexibility of Layout
Due to the truly modular nature of the system, there is a wide range of layout possibilities. The final layout can also be easily modified to suit any future developments or possible rearrangements of an existing layout.

Foundations
Not all sites require foundations, however, this is entirely dependent on ground conditions. Due to the system being lightweight the size of the foundations are smaller than traditional build car parks, time and money are saved

Ramp Design
Our ramps are manufactured from galvanised open grid grate which is not susceptible to dynamic loads in the way that concrete is and therefore cracking to the ramp is eliminated.

The ramps are not affected by adverse weather and do not require de-icing during the winter months.

Control of Rainwater
The deck modules and infill panels are sloped in a single to allow for water to naturally run off to a linear slot line gutter system.

Lighting
The underside light fittings typically give an average 100 lux level. PIR's are incorporated in each fitting which turn on the fittings when required for a set amount of time which is very eco-friendly.

GRP Deck Panels
The surface of the deck is made from a chemical-resistant surface known as GRP. This is a composite material manufactured with an isophthalic resin. The deck finish incorporates a non-slip surface which is created by having carborundum chips embedded into the GRP

These panels have a life expectancy in excess of 50 years and excellent thermal stability capable of withstanding a temperature range of -40 to +150 degrees Celsius.

Paint Specification
The protective coating is expected to give a life expectancy of 15+ years to first maintenance as per ISO12944 C3 environment, high durability paining. The longevity can be extended up to 25 years using an enhanced painting system

Modular System Testing
Load testing has been carried out on the composite decking by both Messrs Sandberg and Queen Mary University to provide structural integrity data on the panels under the designed UDL and point load conditions. Fire testing has been carried out by the BRE to ensure the system complies with current building regulations.

Contact us

Gallery

Sysdex General Description

Modular Car Park Systems
London Refurbishment CompanyVally Plant Training LtdMix-N-Lay Ready Mixed Concrete Supplies (southern)EH Smith Builders MerchantsBudget Designer HomeworksDesigner Door CompanyCMTL LimitedStannah Lifts & Lift Services (HO)Yorkshire Loft Ladders LtdAdvanced Acoustics
Terms and Conditions
2024/10/23 01:52:27