Construction UK Logo For Mobile
Time and date
CONSTRUCTION DIRECTORY

Ardent Consulting Engineers

Ardent Consulting Engineers Contact Details

Telephone
Click to view
Contact
Chris Baker-Pearce
Email
Address
Third Floor
The Hallmark Building
London
EC3M 5JE
England

About Ardent Consulting Engineers

Providing Transport and Infrastructure Solutions to the development industry
Our goal is to help our clients realise their aspirations by ensuring the necessary approvals are identified and secured in an efficient and effective manner. We strive to minimise cost by encouraging innovation whilst ensuring safety is at the forefront of our decision making process.

By delivering a quality product in a sustainable manner, which is on time and within budget, successful working relationships are built and maintained.

Services
We have a raft of experience in all aspects relating to water, drainage and flood risk management. We have staff with a great deal of experience in preparing Flood Risk Assessments (FRA) in accord with the National Planning Policy Framework (NPPF), Sustainable Drainage Systems (SuDS), SFRAs, SWMPs and PFRAs. We also employ the latest software packages (including InfoWorks ICM, XP Storm, Micro Drainage, HecRas, Isis and Isis-Tuflow) in providing FRAs compliant with the National Planning Policy Framework (NPPF) and its Technical Guidance.

The range of services which we offer to our clients includes:
  • Pre-Purchase advice;

  • Preparation of Transport Assessments and Green Travel Plans to accompany planning applications

  • Detailed design and procurement of both adoptable (s104) and private drainage, off-site requisitions, balancing and Sustainable Urban Drainage Systems (SuDS)

  • Preliminary and detailed design of access arrangements, internal layouts of development sites (including advice on parking provision and servicing arrangements) and off-site improvements

  • Preparation and agreement of Drainage Strategies, including advice on addressing the interim and future issue of the SuDS Approving Body

  • Flood Risk Management advice together with advice on the implications of the various requirements and duties under:
    • National Planning Policy Framework (2012)
    • Flood and Water Management Act (2010)

  • Preparation of Flood Risk Assessments

  • Detailed 1d/2d hydraulic modelling, fluvial, tidal breach, fully integrated 1d/2d catchment modelling, which are all which are used to define/map or challenge existing floodplains

  • Product Storage Depots – Risk Analysis of Product Spillage and Environmental Requirements – Oil/Petro-Chem Industry

  • Negotiations of Section 38, 106, and 278 Agreements

  • Determination of utility servicing strategies and procurement

  • Contract preparation, tender analysis, project management

  • Noise Assessments

  • Site Supervision

  • Expert Witness

Gallery

Videos

Ardent Consulting Engineers General Description

Civil Engineers London Consulting Engineers London Engineering Services London Consulant Engineering Services London Site Consultant Engineers London Site consultant Engineering services London Consultant Engineers London
Stainless UK LtdArdent Consulting EngineersStainless UK LtdElite Precast Concrete LtdEH SmithDanaher & Walsh (Plant Hire) LtdCanopy Products LtdCastle Scaffolding Northern LtdBristol Forklifts LtdOakland Projects- Flood Protection
Terms and Conditions